(A) The full width of the right-of-way shall be graded in accordance with the provisions for construction as outlined in §§ 154.080 et seq.
(B) All streets shall be improved in accordance with the standards and specifications for street construction as required by the City Council.
(C) All streets to be surfaced shall be of an overall width in accordance with the standards and specifications for construction as approved by the City Council. The portion of the right-of-way outside the area surfaced shall be seeded or sodded by the developer. Streets shall be accepted by the city upon the completion of the first lift of bituminous. Until the completion of the first lift and acceptance by the city, occupancy permits shall be withheld. The second lift of bituminous shall be completed not less than one year following completion of the first lift unless otherwise approved in writing by the City Engineer.
(D) Where required, the concrete curb and gutter shall be constructed in accordance to the standards and specifications for street construction as set forth and approved by the City Council.
(E) Boulevard sodding shall be planted in conformance with the standards and specifications as required by the City Council.
(F) Street signs of the design approved by the City Council shall be installed at each street intersection.
(G) The Planning Commission and/or City Council may require the provision of sidewalks on arterials and collectors and other streets in proximity to public service areas such as parks, schools, or shopping facilities or in other appropriate locations of a similar nature. The design of the sidewalks shall be considered in their relation to existing and planned sidewalks, to reasonable circulation of traffic, to topographic conditions, to run-off of storm water, and to the proposed uses of the area to be served.
(H) Street lighting fixtures as may be required by the City Council shall be installed.
(Ord. 111, passed 12-23-97; Am. Ord. 1603, passed 3-8-16) Penalty, see § 154.999