§ 152.19 MINIMUM STORM WATER POLLUTION CONTROL MEASURES AND RELATED INSPECTIONS.
   These minimum control measures are required where bare soil is exposed. Due to the diversity of individual construction sites, each site will be individually evaluated. Where additional control measures are needed, they will be specified at the discretion of the City Engineer. The city will determine what action is necessary to prevent excessive erosion from occurring on the site. All stormwater pollution control measures must be in compliance with the city’s Engineering Guidelines.
(Ord. 128, passed 2-8-00; Am. Ord. 1501, passed 1-27-15)