Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
General code penalty: | ||||
First violation | not exceeding $2,500.00 | - | - | |
Second and subsequent violations | not exceeding $7,500.00 | - | - | |
32.02(F) | The filing fees for the following items submitted to the Area Plan Commission for unincorporated St. Joseph County, the City of South Bend, and the Towns of Lakeville, New Carlisle, North Liberty, Osceola, and Roseland shall be as follows: | below: | 79-09 | 9-9-2009 |
Petition Type | 2019 |
Petition Type | 2019 |
AREA BOARD OF ZONING APPEALS | |
Variances First variance Each additional variance | $125.00 $50.00 |
Special use/special exception use Each additional variance | $300.00 $50.00 |
Conditional use Each additional variance | $300.00 $50.00 |
Administrative appeals | $300.00 |
SUBDIVISION SUBMITTALS | |
Major Primary | $800.00 |
Major Secondary | $800.00 |
Minor, combined Primary and Secondary | $500.00 |
Replat, combined Primary and Secondary | $300.00 |
Re-recording | $100.00 |
Type 1 Corrective | $100.00 |
Type 2 Corrective | $100.00 |
Type 3 Corrective | $125.00 |
Plat Vacation | $250.00 |
ZONING SUBMITTALS | |
Single Family | $200.00 |
Other than Single Family | $500.00 |
Planned Unit Development (PUD) | $1,000.00 |
SITE PLANS | |
PUD - Concept Plan | No Fee |
PUD - Secondary Approval | $350.00 |
PUD - Minor Modification | $200.00 |
Final Site Plans - minor modification | $200.00 |
COMBINED HEARING PETITIONS | |
Additional fee for special use and special exception use | $200.00 |
Additional fee for each variance | $50.00 |
OTHER FEES | |
Improvement Location Permits Fences - Non-residential New construction/exterior expansion Interior remodel Signs (separate fee per type) Temporary Uses/Tents | $50.00 $100.00 $50.00 $50.00 $50.00 |
Non-conformance Certificates | $100.00 |
Re-advertise a Petition | $75.00 |
Petition to vacate public ways or public places | $200.00 |
Rezoning Sign (reusable) | $5.00 |
Written Commitments | $100.00 |
Zoning Verifications *Includes local and state agency forms; massage parlors | $50.00 |
*Requiring research such as zoning history; mapping; non-conforming uses; providing available documentation | $100.00 |
Build/Rebuild Letter (per lot/parcel) | $50.00 |
Recording Fees | St. Joseph County Auditor and Recorder Schedule |
Member Jurisdictions | Per respective ordinance or resolution |
(Am. Ord. 48-15, passed 9-8-2015; Ord. 76-17, passed 11-14-2017; Ord. 66-18, passed 12-4-2018; Am. Ord. 59-19, passed 7-9-2019)
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed
|
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed
| |
33.49(B) | Emergency Management: Noncompliance with emergency orders; obstruction or impersonation of EM personnel, fine | $2,500.00 | 124- 2000 | 10-10-2000 | |
34.02(B) | County Election Board vote tabulation fee | not to exceed $5.00 | 27-82 | - - | |
34.03(C) | Enhanced emergency telephone system, monthly service fee per telephone access line | $0.22 | 43-88 | - - | |
34.04(A) | Real and personal property tax liability, annual | $25.00 | 7-93 | - - | |
34.05(A) | Health care related services, County Jail: | ||||
Co-payment | $10.00 | 87-91 | - - | ||
34.05(B) | Prescription handling fee | $3.00 | 87-91 | - - | |
Fees for copies of documents: | |||||
(A) Photocopies (letter-, legal-, and ledger-size) | $0.05/page | 105-99 | 10-12-1999 | ||
(B) Aerial maps or photos: | |||||
(1) Aerial maps or photos | – | 105-99 | 10-12-1999 | ||
(2) First page (sheet) | $5.00 | 105-99 | 10-12-1999 | ||
(3) Each additional page (sheet) | $2.00 | 105-99 | 10-12-1999 | ||
(C) Facsimile transmissions | $1.00/page | 105-99 | 10-12-1999 | ||
(D) Certification of documents (fee shall be in addition to any document fee) | $1.00 | 105-99 | 10-12-1999 | ||
(E) District maps (townships and precincts) | $0.10 | 105-99 | 10-12-1999 | ||
(F) Pursuant to I.C. 33-37-5-1, County Clerk shall collect a fee per page for a copy of any document | $1.00 | 59-08 | 8-12-2008 | ||
34.15(A) | Petty Cash Fund requirements: | ||||
(A) Area Plan Commission | $25.00 | - | - - | ||
(B) Auditor | $40.00 | - | - - | ||
(C) Building Department | $50.00 | - | - - | ||
(D) South Bend Traffic Violation Collection | $100.00 | 48-03 | 5-7-2003 | ||
(E) Clerk-Mishawaka-Support | $100.00 | - | - - | ||
(F) Clerk-Mishawaka-Traffic Court | $50.00 | 56-02 | 5-14-2002 | ||
(G) Clerk-Mishawaka-Drawer #2 | $100.00 | 56-02 | 5-14-2002 | ||
(H) Clerk-South Bend-Support | $250.00 | - | - - | ||
(I) Clerk-Non Support Collections | $75.00 | 48-03 | 5-7-2003 | ||
(J) Community Based Corrections | $40.00 | - | - - | ||
(K) Health Department | $1,400.00 | 93-20 | 12-8-20 | ||
(L) Highway Department | $25.00 | ||||
(M) Park Department | $1,000.00 | 35-10 | 4-13-2010 | ||
(N) Park Department Non-Reverting | $900.00 | 35-10 | 4-13-2010 | ||
(O) Recorder | $150.00 | 51-98 | 6-9-1998 | ||
(P) Sheriff | $25.00 | - | - - | ||
(Q) Small Claims Court | $200.00 | 48-03 | 5-7-2003 | ||
(R) So. Bend Traffic and Misdemeanor | $300.00 | 48-03 | 5-7-2003 | ||
(S) Treasurer | $2,000.00 | 76-97 | 7-8-1997 | ||
(T) Welfare Department | $200.00 | - | - - | ||
(U) Small Claims Court-Mishawaka | $25.00 | - | - - | ||
(V) Clerk-Non-Support Collections-Mishawaka | $50.00 | - | - - | ||
(W) Clerk-Probate Court, Juvenile Justice Center | $50.00 | 60-97 | 6-10-1997 | ||
34.16(C) | Tax levy rate on each $100.00 assessed valuation of all taxable personal and real property within the county | $0.30 | 89-78 | - -1978 | |
34.18(D) (1) | Tax levy rate on each $100.00 assessed valuation of all taxable personal and real property within the county | $0.10 | 22-8 | - -1981 | |
34.22(B) | Portage Manor Farm Operating Fund, quarterly balance | $30,000.00 | 75-86 | - -1986 | |
34.24(C) | Fees for Plat Book Fund | $5.00 | 46-09 | 6-9-2009 | |
34.25(C) | Drug Testing Fee Fund, unencumbered balance | $10,000.00 | 21-91 | - - | |
34.26(C) | Adult Probation Drug Testing Fee Fund, unencumbered balance | $10,000.00 | 30-92 | - - | |
34.27(B) | Prisoner reimbursement payment amount | $30.00 | 65-98 | 7-14-1998 | |
34.30(B) | Medical care for jail inmate, co-payment fee | $15.00 | 101-04 | 9-14-2004 | |
Administrative fees: | |||||
Copy machine duplicate (letter-, legal- and ledger-size) | $0.05/page | 50-05 | 5-10-2005 | ||
Criminal history | $10.00 | 50-05 | 5-10-2005 | ||
Fingerprinting (non-prisoners) | $5.00 | 50-05 | 5-10-2005 | ||
Employment record check | $5.00 | 50-05 | 5-10-2005 | ||
Document search | $5.00 | 50-05 | 5-10-2005 | ||
8-inch x 10-inch photo (black and white) | $5.00 | 50-05 | 5-10-2005 | ||
8-inch x 10-inch photo (color) | $7.00 | 50-05 | 5-10-2005 | ||
Microfilm copy | $3.00 | 50-05 | 5-10-2005 | ||
Sheriff mortgage foreclosure sale | $200.00 | 38-08 | 5-13-2008 | ||
34.49(A) | Supplemental recording fee | $3.00 | 97-95 | - - | |
34.50(A) | Sex or violent offender: | ||||
Registration fee | $50.00/ year | 90-07 | 10-9-2007 | ||
Address change fee | $5.00 | 90-07 | 10-9-2007 | ||
34.51(G) | Bad check service charge | $20.00 | 69-07 | 8-14-2007 | |
Standard DRCB fees (per party) based on services rendered | |||||
Intake screen | $50.00 | 146-11 | 12-6-2011 | ||
Mediation | $50.00 | 146-11 | 12-6-2011 | ||
Mediation case management (up to 1 year) | $100.00 | 146-11 | 12-6-2011 | ||
Case management (up to 1 year) | $200.00 | 146-11 | 12-6-2011 | ||
Focused evaluation (1 issue) | $200.00 | 146-11 | 12-6-2011 | ||
Focused evaluation (2+ issues) | $400.00 | 146-11 | 12-6-2011 | ||
Comprehensive evaluation | $800.00 | 146-11 | 12-6-2011 | ||
Missed office appointment | $10.00 | 146-11 | 12-6-2011 | ||
Missed home visit appointment | $25.00 | 146-11 | 12-6-2011 | ||
County Coroner service fee for non-county services
|
$400.00
|
41-17
|
6-13-2017 | ||
DISCOUNTED FEES BASED ON AREA MEDIAN FAMILY INCOME & FEDERAL POVERTY GUIDELINES FOR CURRENT FISCAL YEAR | |||||
Family or Household Unit Size | No Fee | 25% Pay | 50% Pay | 75% Pay | 100% Pay |
250% | 300% | 350% | 400% | >400% |
DISCOUNTED FEES BASED ON AREA MEDIAN FAMILY INCOME & FEDERAL POVERTY GUIDELINES FOR CURRENT FISCAL YEAR | |||||
Family or Household Unit Size | No Fee | 25% Pay | 50% Pay | 75% Pay | 100% Pay |
250% | 300% | 350% | 400% | >400% | |
1 | $28,725 | $34,470 | $40,215 | $45,960 | $45,961 |
2 | $38,775 | $46,530 | $54,285 | $62,040 | $62,041 |
3 | $48,825 | $58,590 | $68,355 | $78,120 | $78,121 |
4 | $58,875 | $70,650 | $82,425 | $94,200 | $94,201 |
5 | $68,925 | $82,710 | $96,495 | $110,280 | $110,281 |
6 | $78,975 | $94,770 | $110,565 | $126,360 | $126,361 |
7 | $89,025 | $106,830 | $124,635 | $142,440 | $142,441 |
8 | $99,075 | $118,890 | $138,705 | $158,520 | $158,521 |
For each additional person add | $10,050 | $12,060 | $14,070 | $16,080 | |
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
35.05(B) (6)(c) | Poverty wage | $8.80/hour | 24-09 | 5-12-2009 |
35.06(B) | Total construction cost | $750,000.00 | 24-09 | 5-12-2009 |
35.06(C) (1)(d)1.c. | Self-sufficiency wage | $12.90/ hour | 24-09 | 5-12-2009 |
35.06(C) (1)(d)2. | Mean hourly wage rate | $17.37/ hour | 24-09 | 5-12-2009 |
35.06(C) (1)(d)3. | Out-of-pocket costs | $3,000.00 | 24-09 | 5-12-2009 |
35.06(C) (1)(d)5. | Certified training or educational courses | $500.00/ employee | 24-09 | 5-12-2009 |
35.06(C) (1)(d)6. | Dependent care, day care, annual limit | $5,000.00/ employee | 24-09 | 5-12-2009 |
35.06(C) (1)(d)7. | Value of transportation assistance | at least $150.00/ employee | 24-09 | 5-12-2009 |
35.06(C) (1)(d)8. | Value of home ownership program | at least $150.00/ employee | 24-09 | 5-12-2009 |
35.30(B) | Tax abatement application fees: | |||
Real property | $400.00 | 24-09 | 5-12-2009 | |
Personal property | $400.00 | 24-09 | 5-12-2009 | |
Annual processing fee | $250.00 | 24-09 | 5-12-2009 | |
35.99(B) (1) | Failure to file annual report, fine | up to $2,500.00 | 24-09 | 5-12-2009 |
35.99(B) (2) | Failure to provide sufficient evidence, maximum fine | up to $2,500.00 | 24-09 | 5-12-2009 |
50.99(B) | not to exceed $1,000.00 | 101-78 | - -1978 | |
50.99(C) | not more than: | |||
First offense | $500.00 | 98-78 | - -1978 | |
Second offense | $1,000.00 | 98-78 | - -1978 | |
Third and subsequent offenses | $1,000.00 | 98-78 | - -1978 | |
51.99(A) | Violations of Ch. 51: | Not more than: | ||
First offense | $500.00 | 58-07 | 7-17-2007 | |
Second offense | $1,000.00 | 58-07 | 7-17-2007 | |
Subsequent offenses | $1,500.00 | 58-07 | 7-17-2007 | |
52.999(A)(1) | Not more than: | |||
First offense | $500.00 | 78-07 | 9-11-2007 | |
Second offense | $1,000.00 | 78-07 | 9-11-2007 | |
Subsequent offenses | $1,500.00 | 78-07 | 9-11-2007 | |
52.999(B)(2) | Not more than | |||
First offense | $500.00 | 38-05 | 4-12-2005 | |
Second offense | $1,000.00 | 38-05 | 4-12-2005 | |
Subsequent offenses | $1,500.00 | 38-05 | 4-12-2005 | |
52.999(C)(2) | Not more than: | |||
First offense | $500.00 | 103-98 | 10-14-1997 | |
Second offense | $1,000.00 | 103-98 | 10-14-1997 | |
Subsequent offenses | $1,500.00 | 103-98 | 10-14-1997 | |
53.03(D) | SWPPP filing fee | $150.00 | 33-06 | 4-11-2006 |
53.99(A) | Land disturbance without SWPPP and notification, fine | $1,000.00 | 33-06 | 4-11-2006 |
53.99(B) (3) | Violation of a site’s SWPPP, second offense: Civil penalty | $250.00 | 33-06 | 4-11-2006 |
53.99(B) (4) | Violation of a site’s SWPPP, third offense: Civil penalty | $500.00 | 33-06 | 4-11-2006 |
70.21(F) | Violations of speed limits set forth in Chapter 74, Schedule I and as described in § 70.21: | |||
(1) For a violation involving speeding not more than 20 miles per hour over the posted speed limit: for each mile over the speed limit | $1.00 | 38-05 | 5-10-2005 | |
(2) For a violation involving speeding in excess of 20 mph over the posted speed limit: for each mile over the speed limit | $3.00 | 38-05 | 5-10-2005 | |
Further punishments or penalties: the amount of judgment being entered against such person shall not exceed $500.00. | 38-05 | 5-10-2005 | ||
Traffic violations: | ||||
Parking violation | $2.00 | 132-78 | - -1978 | |
Other violations | $25.00 | 132-78 | - -1978 | |
Fine, violation of Title VII | Not less than $2.00, nor more than $100.00 | 132-78 | - -1978 | |
Violation of handicapped parking areas, fine | $50.00 | 15-87 | - - | |
Permit for movement of mobile homes, fee | $25.00 | 1971-1 | - -1971 | |
73.99(A) | not more than $500.00 | 66-97 | 6-10-1997 | |
73.99(B) | Violations of § 73.11, fine | $100.00 | 88-03 | 9-9-2003 |
90.31(I) | Failure to inoculate, penalty | $75.00 | 10-07 | 1-9-2007 |
90.60(A) | Controlled animal permit, non-refundable application fee | $500.00 | 10-07 | 1-9-2007 |
Annual fee, per animal | $100.00 | 10-07 | 1-9-2007 | |
90.60(B) | Pet shop permit, annual fee | $250.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 |
90.60(C) | Dangerous animal permit, annual fee, per animal | $100.00 | 10-07 | 1-9-2007 |
90.60(D) | Public nuisance animal permit, annual fee or until the animal is no longer deemed a public nuisance | $100.00 | 10-07 | 1-9-2007 |
90.60(E) | Animal performance permit, per day | $100.00 | 10-07 | 1-9-2007 |
90.60(F) | Minor breeder permit | $100.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 |
90.60(G) | Major breeder permit | $250.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 |
90.60(H) | Kennel/cattery permit, annual fees: | |||
1-15 dogs/cats | $150.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | |
16-25 dogs/cats | $200.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | |
26 or more dogs/cats | $250.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | |
90.60(I) | Omnibus permit, yearly | $300.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 |
90.60(K) | Shelter permit, annual fee | $100.00 | 10-07 | 1-9-2007 |
90.60(L) | Exterminator permit, annual fee | $50.00 | 10-07 | 1-9-2007 |
90.61(B) | Impoundment/redemption fees: | below: | 10-07; 33-17 | 1-9-2007; 5-9-2017 |
First Redemption* | Second Redemption* | Third Redemption* | Fourth & Subsequent Redemptions** |
First Redemption* | Second Redemption* | Third Redemption* | Fourth & Subsequent Redemptions** |
$25.00 - first day | $50.00 - first day | $75.00 - first day and Dangerous dog license or nuisance license | $250.00 fine for Dangerous dog license or nuisance license |
$12.00 per additional day | $12.00 per additional day | $12.00 per additional day | $20.00 per additional day |
Microchip fee as applicable | Microchip fee as applicable | Microchip fee as applicable | Microchip fee as applicable |
Licensing fee | Licensing fee | Licensing fee | Licensing fee |
Veterinary fees** | Veterinary fees** | Veterinary fees** | Veterinary fees** |
No/invalid rabies vaccination fine $25.00 | No/invalid rabies vaccination fine $50.00 | No/invalid rabies vaccination fine $75.00 | No/invalid rabies vaccination fine $100.00 |
* In a 12-month period | |||
** Based on the discretion and findings of the Animal Control Agency and collection of veterinary fees. | |||
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed | |
90.64(A) | |||||
90.64(D ) | 1-year county tags sold to veterinarians: | ||||
(1) Altered and microchipped, yearly | $5.00 | 10-07 | 1-9-2007 | ||
(2) Altered and non-microchipped, yearly | $10.00 | 10-07 | 1-9-2007 | ||
(3) Non altered and microchipped, yearly | $30.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | ||
(4) Unaltered and non-microchipped, yearly | $50.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | ||
90.99(A) | Violation of Ch. 90: | ||||
First offense, minimum fine not to exceed | $25.00 $2,500.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | ||
Second or subsequent offenses not to exceed | $50.00 $7,500.00 | 10-07; 33-17 | 1-9-2007; 5-9-2017 | ||
Each violation of Ch. 91, fine | not less than $10.00 nor more than $1,000.0 0 | 42-02 | 4-9-2002 | ||
92.99(B) (3) | $50.00 | 70-90 | - - | ||
92.99(C) | 83-09 | 10-13- 2009 | |||
First offense | $100.00 | 83-09 | 10-13- 2009 | ||
Second offense | $250.00 | 83-09 | 10-13- 2009 | ||
In no case shall the fine exceed $2,500.00 for the first such incident or $7,500.00 for subsequent incidents. | 83-09 | 10-13- 2009 | |||
94.03(B) | False alarms user fee, each additional false alarm after third within calendar year, with Police Department response | $100.00 | 20-07 | 2-20- 2007 | |
94.99(A) | Each violation of Ch. 94: | ||||
First violation | $100.00 | 33-86 | - - | ||
Each violation thereafter | $200.00 | 33-86 | - -
| ||
96.09(A) | Smoking regulations, violations charges to manager/owner/ operator: | ||||
(1) First violation | Verbal warning | 04-06 | 1-17- 2006 | ||
(2) Second violation | Written warning | 04-06 | 1-17- 2006 | ||
(3) Third violation | A fine of $100.00 | 04-06 | 1-17- 2006 | ||
(4) Fourth violation | A fine of $200.00 | 04-06 | 1-17- 2006 | ||
(5) For each additional violation | Fine not exceedin g $500.00 | 04-06 | 1-17- 2006 | ||
96.09(G) | A person who smokes in an area where smoking is prohibited by the provisions of Ch. 96 | fine not exceedin g $50.00 | 04-06 | 1-17- 2006 | |
Transient merchant’s license | $100.00 per each 6-month period | 16-87 | - - | ||
111.01( D) | Secondhand store license fee, annual | $50.00 | 01-89 | - - | |
111.02( A)(2) | Violation of Ch. 111, doing business without a license | $25.00 | 01-89 | - - | |
111.17( B) | Precious metals dealer, annual license fee | $100.00 | 30-82 | 4-13- 1982 | |
111.18( B) | Precious metals promoter’s license, annual license fee | $25.00 | 30-82 | 4-13- 1982 | |
Application fee for permit to sell drug-related paraphernalia | $250.00 | 58-82 | 8-10- 1982 | ||
Permit renewal fee for permit to sell drug-related paraphernalia | $250.00 | 58-82 | 8-10- 1982 | ||
111.99( B) | Violation of the provisions of § 110.01, fine | not less than $100.00 or more than $2,500.0 0 | 01-89 | - - | |
111.99( C) | not less than $100.00 nor more than $1,000.0 0 | 30-82 | 4-13- 1982 | ||
111.99( D) | not less than $500.00 and not more than $2,500.0 0 | 58-82 | 8-10- 1982 | ||
Permit application fee for circus, carnival, sideshow, street fair or similar: | |||||
First day of performance or display | 300.00 | 14-79 | - -1979 | ||
Each additional day | 50.00 | 14-79 | - -1979 | ||
Violations of Ch. 113: | |||||
First offense, not more than | $500.00 | 16-03 | 2-11-203 | ||
Second offense, not more than | $1,000.0 0 | 16-03 | 2-11-203 | ||
Third and subsequent offenses, not more than | $1,500.0 0 | 16-03 | 2-11-203 | ||
Tattooing regulations, any violations: | |||||
First offense | not more than $500.00 | 96-02 | 9-10- 2002 | ||
Second offense | not more than $1,000.0 0 | 96-02 | 9-10- 2002 | ||
Third offense and each subsequent offense | not more than $1,500.0 0 | 96-02 | 9-10- 2002 | ||
115.03(J ) | Application fee for sexually oriented business permit, nonrefundable | $100.00 | 161- 2000 | 12-12-2000 | |
Sexually oriented business, annual fee | $200.00 | 161- 2000 | 12-12-2000 | ||
Sexually oriented business employee license, permit fee | $25.00 | 161- 2000 | 12-12-2000 | ||
Violates of provisions of this chapter, fine | not to exceed $2,500.0 0 for each violation | 161- 2000 | 12-12-2000 | ||
Violation of this chapter, fine: | |||||
First offense | not more than $500.00 | 22-07 | 2-20-2007 | ||
Second | $1,000.0 0 | 22-07 | 2-20-2007 | ||
For each subsequent offense | not more than $2,500.00 | 22-07 | 2-20-2007 | ||
Civil penalty for property found to be chronic nuisance property | up to $100.00 per day | 09-02 | 1-8-2002 | ||
130.99( B) | |||||
First offense | not less than $100.00 | 55-04 | 5-11- 2004 | ||
Second offense | not less than $250.00 | 55-04 | 5-11- 2004 | ||
Third and subsequent offenses | not less than $500.00 | 55-04 | 5-11- 2004 | ||
For any violation | nor more than $2,500.00 | 55-04 | 5-11- 2004 | ||
130.99( C) | not less than $2,500.00 | 67-03 | 7-8-2003 | ||
130.99( D) | not less than $1,000.0 0 or more than $2,500.00 | 78-99 | 7-13- 1999 | ||
131.99( B) | not more than $2,500.00 | 29-91 | - - | ||
131.99( C) | not to exceed $1,000.0 0 | 84-79 | - - | ||
Parent whose child commits a curfew violation per 132.06: | |||||
First offense | $25.00 | 3-95 | - - | ||
Second offense within a 1-year period, a fine plus court cost: | $100.00 | 3-95 | - - | ||
Third offense and every subsequent offense within a 1-year period, a fine plus court costs | $200.00 | 3-95 | - - | ||
150.02( B) | Filing fees: | ||||
(1) Variances and appeals | $85.00 | 77-07 | 9-11-2007 | ||
(2) Special uses | $300.00 | 77-07 | 9-11-2007 | ||
(3) Each variance filed simultaneously with another variance or special use | $45.00 | 82-11 | 8-16-2011 | ||
150.02( C) | Improvement location permits: | ||||
(1) First term | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12-2016 | ||
(2) Renewal | $45.00 | 82-11 | 8-16-2011 | ||
150.02( D) | Document process fees: | ||||
(1) Zoning verification only | $40.00 | 14-09; 4-16 | 2-10- 2009; 1- 12-2016 | ||
(2) All other documents | $50.00 | 14-09 | 2-10-2009 | ||
150.17( A)(1) | (d) Minimum Fee | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
150.17( A)(2) | Estimated construction costs, permit fees: | below: | 82-11 | 8-16-2011 | |
$1.00 to 3,000.00 | $40.00 | 4-16 | 1-12-2016 | ||
$3.001.00 to 4,000.00 | $45.00 | ||||
$4,001.00 to 5,000.00 | $50.00 | ||||
$5,001.00 to 6,000.00 | $55.00 | ||||
$6,001.00 to 7,000.00 | $60.00 | ||||
$7,001.00 to 8,000,00 | $65.00 | ||||
$8,001.00 to 9,000.00 | $70.00 | ||||
$9,001.00 to 10,000.00 | $75.00 | ||||
$10,001.00 to 11,000.00 | $80.00 | ||||
$11,001.00 to 12,000.00 | $85.00 | ||||
$12,001.00 to 13,000.00 | $90.00 | ||||
$13,001.00 to 14,000.00 | $95.00 | ||||
$14,001.00 to 15,000.00 | $100.00 | ||||
$15,001.00 to 16,000.00 | $105.00 | ||||
$16,001.00 to 17,000.00 | $110.00 | ||||
$17,001.00 to 18,000.00 | $115.00 | 82-11 | 8-16-2011 | ||
$18,001.00 to 19,000.00 | $118.00 | ||||
$19,001.00 to 20,000.00 | $121.00 | ||||
$20,001.00 to 21,000.00 | $124.00 | ||||
$21,001.00 to 22,000.00 | $127.00 | ||||
$22,001.00 to 23,000.00 | $130.00 | ||||
$23,001.00 to 24,000.00 | $133.00 | ||||
$24,001.00 to 25,000.00 | $136.00 | ||||
$25,001.00 to 26,000.00 | $139.00 | ||||
$26,001.00 to 27,000.00 | $142.00 | ||||
$27,001.00 to 28,000.00 | $145.00 | ||||
$28,001.00 to 29,000.00 | $148.00 | ||||
$29,001.00 to 30,000.00 | $151.00 | ||||
$30,001.00 to 31,000.00 | $154.00 | ||||
$31,001.00 to 32,000.00 | $157.00 | ||||
$32,001.00 to 33,000.00 | $160.00 | ||||
$33,001.00 to 34,000.00 | $163.00 | ||||
$34,001.00 to 35,000.00 | $166.00 | ||||
$35,001.00 to 36,000.00 | $169.00 | ||||
$36,001.00 to 37,000.00 | $172.00 | ||||
$37,001.00 to 38,000.00 | $175.00 | ||||
$38,001.00 to 39,000.00 | $178.00 | ||||
$39,001.00 to 40,000.00 | $181.00 | ||||
$40,001.00 to 41,000.00 | $184.00 | ||||
$41,001.00 to 42,000.00 | $187.00 | ||||
$42,001.00 to 43,000.00 | $190.00 | ||||
$43,001.00 to 44,000.00 | $193.00 | ||||
$44,001.00 to 45,000.00 | $196.00 | ||||
$45,001.00 to 46,000.00 | $199.00 | ||||
$46,001.00 to 47,000.00 | $202.00 | ||||
$47,001.00 to 48,000.00 | $205.00 | ||||
$48,001.00 to 49,000.00 | $208.00 | ||||
$49,001.00 to 50,000.00 | $211.00 | ||||
$50,001.00 to 51,000.00 | $214.00 | ||||
$51,001.00 10 52,000.00 | $217.00 | ||||
$52,001.00 to 53,000.00 | $220.00 | ||||
$53,001.00 to 54,000.00 | $223.00 | ||||
$54,001.00 to 55,000.00 | $226.00 | ||||
$55,001.00 to 56,000.00 | $229.00 | ||||
$56,001.00 to 57,000.00 | $232.00 | ||||
$57,001.00 to 58,000.00 | $235.00 | ||||
$58,001.00 to 59,000.00 | $237.00 | ||||
$59,001.00 to 60,000.00 | $239.00 | ||||
$60,001.00 to 61,000.00 | $241.00 | ||||
$61,001.00 to 62,000.00 | $243.00 | ||||
$62,001.00 to 63,000.00 | $245.00 | ||||
$63,001.00 to 64,000.00 | $247.00 | ||||
$64,001.00 to 65,000.00 | $249.00 | ||||
$65,001.00 to 66,000.00 | $251.00 | ||||
$66,001.00 to 67,000.00 | $253.00 | ||||
$67,001.00 to 68,000.00 | $255.00 | ||||
$68,001.00 to 69,000.00 | $257.00 | ||||
$69,001.00 to 70,000.00 | $259.00 | ||||
$70,001.00 to 71,000.00 | $261.00 | ||||
$71,001.00 to 72,000.00 | $263.00 | ||||
$72,001.00 to 73,000.00 | $265.00 | ||||
$73,001.00 to 74,000.00 | $267.00 | ||||
$74,001.00 to 75,000.00 | $269.00 | ||||
$75,001.00 to 76,000.00 | $271.00 | ||||
$76,001.00 to 77,000.00 | $273.00 | ||||
$77,001.00 to 78,000.00 | $275.00 | ||||
$78,001.00 to 79,000.00 | $277.00 | ||||
$79,001.00 to 80,000.00 | $279.00 | ||||
$80,001.00 to 81,000.00 | $281.00 | ||||
$81,001.00 to 82,000.00 | $283.00 | ||||
$82,001.00 to 83,000.00 | $285.00 | ||||
$83,001.00 to 84,000.00 | $287.00 | ||||
$84,001.00 to 85,000.00 | $289.00 | ||||
$85,001.00 to 86,000.00 | $291.00 | ||||
$86,001.00 to 87,000.00 | $293.00 | ||||
$87,001.00 to 88,000.00 | $295.00 | ||||
$88,001.00 to 89,000.00 | $297.00 | ||||
$89,001.00 to 90,000.00 | $299.00 | ||||
$90,001.00 to 91,000.00 | $301.00 | ||||
$91,001.00 to 92,000.00 | $303.00 | ||||
$92,001.00 to 93,000.00 | $305.00 | ||||
$93,001.00 to 94,000.00 | $307.00 | ||||
$94,001.00 to 95,000.00 | $309.00 | ||||
$95,001.00 to 96,000.00 | $311.00 | ||||
$96,001.00 to 97,000.00 | $313.00 | ||||
$97,001.00 to 98,000.00 | $315.00 | ||||
$98,001.00 to 99,000.00 | $317.00 | ||||
$99,001.00 to 100,000.00 | $320.00 | ||||
$100,000.00 and up | $320.00 | ||||
Plus, per $1,000.00 of estimated construction cost thereafter, up to $1,000,000.00 total estimated construction cost | $0.90 | 82-11 | 8-16-2011 | ||
Plus, per $1,000.00 of estimated construction costs thereafter | $0.60 | 82-11 | 8-16-2011 | ||
150.17( A)(3) | Each re-inspection made by Department inspectors of commercial and industrial projects | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
150.17( A)(4) | Each additional final inspection necessitated by the failure to pass the previous final inspection | $60.00 | 82-11 | 8-16-2011 | |
150.17( A)(5) | Wrecking and demolition permits: | ||||
1. Residential: | |||||
Per square foot | $0.02 | 82-11 | 8-16-2011 | ||
Minimum fee | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
2. Commercial: | |||||
Per square foot | $0.015 | 82-11 | 8-16-2011 | ||
Minimum fee | $40.00 | 82-11 | 8-16-2011 | ||
150.18( A) | Electrical permits issued and obtained prior to commencement of the work, minimum fee | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
150.18( A)(1) | (1) Switchboards and panel boards each, new and replaced: | ||||
60-amp | $7.00 | 14-09 | 2-10-2009 | ||
100-amp | $9.00 | 14-09 | 2-10-2009 | ||
200-amp | $12.00 | 14-09 | 2-10-2009 | ||
400-amp | $15.00 | 14-09 | 2-10-2009 | ||
600-amp | $20.00 | 14-09 | 2-10-2009 | ||
over 600- to 2,000-amp | $25.00 | 14-09 | 2-10-2009 | ||
over 2,000-amp | $50.00 | 14-09 | 2-10-2009 | ||
(2) Temporary services for construction, all amperage | $7.00 | 14-09 | 2-10-2009 | ||
(3) Each circuit (new or replaced) If the exact number of circuits is unknown at the time of application for a permit, a permit may be taken for the minimum amount known with new permits issued as the extent of the work known | $5.00 | 14-09 | 2-10-2009 | ||
(4) Horsepower (machinery) If the exact number of horsepower is unknown at the time of application for a permit, a permit may be taken for the minimum amount known with new permits issued as the extent of the work known. | below: | ||||
(a) First hp | $7.00 | 14-09 | 2-10-2009 | ||
(b) Each additional hp | $0.25 | 14-09 | 2-10-2009 | ||
(5) Back-up generator: | |||||
(a) 10 Kv or less | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(b) Over 10 Kv | $50.00 | 82-11 | 8-16-2011 | ||
(6) Pool wiring and/or bonding | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(7) Repair, extension and/or maintenance of wiring | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(8) Reset, relocation and reconnect fees, each | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(9) Each re-inspection fee | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(10) Each additional final inspection | $60.00 | 82-11 | 8-16-2011 | ||
150.19(A) | Plumbing permits issued and obtained prior to commencement of the work, minimum fee: | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(1) Each plumbing fixture or trap or set of fixtures on one trap, including water and drainage piping therefor | $6.00 | 2-11 | 816-2011 | ||
(2) Each backflow protection | $6.00 | 82-11 | 8-16-2011 | ||
(3) Each building sewer: | |||||
(a) Under 100 ft. | $12.00 | 82-11 | 8-16-2011 | ||
(b) 100 ft. or over | $25.00 | 82-11 | 8-16-2011 | ||
(4) Each building water: | |||||
(a) Under 100 ft. | $12.00 | 82-11 | 8-16-2011 | ||
(b) 100 ft. or over | $25.00 | 82-11 | 8-16-2011 | ||
(5) Each water softener | $7.00 | 82-11 | 8-16-2011 | ||
(6) Each trailer park sewer | $10.00 | 82-11 | 8-16-2011 | ||
(7) Each drain within building for rainwater systems | $6.00 | 82-11 | 8-16-2011 | ||
(8) Each water heater and/or vent: | $7.00 | 82-11 | 8-16-2011 | ||
(9) Each gas reconnection | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
(10) Each gas piping system, per outlet | $3.00 | 82-11 | 8-16-2011 | ||
(11) Each industrial waste pretreatment interception, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps | $8.00 | 82-11 | 8-16-2011 | ||
(12) Installation, alteration or repair of water piping and/or water treating equipment | $6.00 | 82-11 | 8-16-2011 | ||
(13) Repair or alteration of drainage or vent piping | $6.00 | 82-11 | 8-16-2011 | ||
(14) Each drywell | $12.00 | 82-11 | 8-16-2011 | ||
(15) Each lawn sprinkler system on any one meter, including backflow protection devices thereof | $6.00 | 82-11 | 8-16-2011 | ||
(16) Fire protection sprinkler system: | |||||
Up to 30 heads | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | ||
Plus each additional 10 heads thereafter | $8.00 | 82-11 | 8-16-2011 | ||
(17) Gas tanks and pumps | $12.00 | 82-11 | 8-16-2011 | ||
(18) Back-up Generator - gas line: | |||||
10 Kv or less | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | ||
Over 10 Kv | $50.00 | 82-11 | 8-16-2011 | ||
(19) Each reinspection | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | ||
(20) Each additional final inspection | $60.00 | 82-11 | 8-16-2011 | ||
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
Code Section | Fee or Fine Description | Amount ($) | Ord. No. | Date Passed |
150.20(A) | Heating and air conditioning permits issued and obtained prior to commencement of the work, minimum fee: | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 |
(1) Space heaters, each 30,000 BTU input or more | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(2) Warm-air furnaces, unit heaters, cabinet heaters, and radiant tube heaters | $40.00 | 4-16 | 1-12-2016 | |
(3) Oil and gas conversions | $40.00 | 4-16 | 1-12-2016 | |
(4) Electric furnaces (air handling) | $40.00 | 4-16 | 1-12-2016 | |
(5) Air conditioning | ||||
(a) Central, electric: | ||||
1. Less than 10 tons | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
2. Over 10 tons | $60.00 | 82-11 | 8-16-2011 | |
(b) Water chillers | $85.00 | 82-11 | 8-16-2011 | |
(c) EMI - air blowers | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(6) Ventilating, exhaust systems, unit ventilators: | ||||
(a) Less than 500 CFM capacity | $6.00 | 82-11 | 8-16-2011 | |
(b) 500 to 1,500 CFM capacity | $12.00 | 82-11 | 8-16-2011 | |
Plus, for each 500 CFM or fraction thereof in excess of 1,500 CFM) | $1.00 | |||
(7) Ventilating commercial hoods, including make-up air: | ||||
(a) 500 CFM to 1,500 CFM capacity | $60.00 | 82-11 | 8-16-2011 | |
(b) Over 1,500 CFM capacity | $120.00 | 82-11 | 8-16-2011 | |
(8) Refrigeration and engine-drive, gas-fired, or oil-fired cooling equipment: | ||||
(a) 1 to 10 horsepower, each | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(b) More than 10 horsepower, each | $45.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(9) Rooftop combination furnace and air conditioning units: | ||||
Up to 300,000 BTUs, each: | ||||
1. Up to 7-1/2 tons | $45.00 | 82-11 | 8-16-2011 | |
2. 7-1/2 tons or more | $70.00 | 82-11 | 8-16-2011 | |
(10) Heat pumps: | ||||
(a) 1,000 to 60,000 BTUs input | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(b) 60,000 to 300,000 BTUs input: | ||||
1. Up to 7-1/2 tons, each | $45.00 | 82-11 | 8-16-2011 | |
2. 7-1/2 tons or more, each | $85.00 | 82-11 | 8-16-2011 | |
(c) Earth, coupled water source | $60.00 | 82-11 | 8-16-2011 | |
(11) Boilers, steam or hot water: | ||||
(a) Up to 300,000 BTUs | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(b) 300,000 BTUs or more | $60.00 | 82-11 | 8-16-2011 | |
(12) Through-wall combination air conditioning/heating and VAV boxes with coil: | ||||
(a) First unit | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(b) Each additional unit | $12.00 | 82-11 | 8-16-2011 | |
(c) Solar heat units | $60.00 | 82-11 | 8-16-2011 | |
(13) Air handlers: | ||||
(a) 400 CFM to 2,500 CFM | $40.00 | 82-11; 4-16 | 8-16-2011; 1-12- 2016 | |
(b) Over 2,500 CFM | $70.00 | 82-11 | 8-16-2011 | |
(14) Back-up generator: | ||||
(a) 10 Kv or less | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(b) Over 10 Kv | $50.00 | 82-11 | 8-16-2011 | |
(15) Duct and register, per system: | ||||
(a) First 15 openings, per system | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(b) Each opening thereafter, per system | $1.00 | 82-11 | 8-16-2011 | |
(16) Gas reconnection | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(17) Gas piping (distribution of piping to equipment) to be included on permit application: Each gas piping system per outlet | $3.00 | 82-11 | 8-16-2011 | |
(18) Woodburning stoves, per flue (including chimney and chimney connector) | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(19) Each reinspection fee | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(20) Each additional final inspection | $60.00 | 82-11 | 8-16-2011 | |
150.21(A) | (1) Less than 25 square feet of display area and embellishments | $40.00 | 82-11 | 8-16-2011 |
(2) 25 to 50 square feet of display area and embellishments | $60.00 | 82-11 | 8-16-2011 | |
(3) 50 to 100 square feet of display area and embellishments | $85.00 | 82-11 | 8-16-2011 | |
(4) In excess of 100 square feet of display area and embellishments | $120.00 | 82-11 | 8-16-2011 | |
(5) Temporary signs: | ||||
(a) Initial permit | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
(b) Each extension | $45.00 | 82-11 | 8-16-2011 | |
Moving permits for buildings: | ||||
(1) One- or two-story building | $125.00 | 82-11 | 8-16-2011 | |
(2) Over two-story building | $175.00 | 82-11 | 8-16-2011 | |
150.23(A) | A driveway permit issued and obtained prior to commencement of work for which the permit is required: | |||
(a) Residential/agricultural | $35.00 | 47-09 | 6-9-2009 | |
(b) All other zoning applications, such as commercial, business and/or industrial | $200.00 | 47-09 | 6-9-2009 | |
150.23( B) | Depressed curb work, more commonly referred to as “curb cut” (includes all inspections required for depressed curb work) | additiona l $300.00 | 47-09 | 6-9-2009 |
(A) For one road bore and work of the initial one- fourth mile right-of-way (easement work) | $50.00 | 47-09 | 6-9-2009 | |
(B) For each additional road bore | $50.00 | 47-09 | 6-9-2009 | |
(C) For each additional one-fourth mile of right- of-way (easement) work | $15.00 | 47-09 | 6-9-2009 | |
(D) For each permit involving open excavation | $200.00 | 47-09 | 6-9-2009 | |
Reinspection fee | $450.00 | 47-09 | 6-9-2009 | |
150.26(A) | (1) Performing excavation or any work on, below or above a right-of-way without a driveway or utility permit: | |||
(a) First offense | $500.00 | 47-09 | 6-9-2009 | |
(b) Second offense | $700.00 | 47-09 | 6-9-2009 | |
(c) Third offense | $1,000.0 0 | 47-09 | 6-9-2009 | |
(2) Failure to activate a permit | $450.00 | 47-09 | 6-9-2009 | |
(3) Improper backfill (type of fill or compacting) | $1,000.0 0 | 47-09 | 6-9-2009 | |
(4) Improper permanent surface restoration | $450.00 | 47-09 | 6-9-2009 | |
(5) Improper maintenance of traffic (type of temporary traffic control devices) | $500.00 | 47-09 | 6-9-2009 | |
150.31( B) | Adopt-a-Road/Adopt-a-Spot permits | |||
Initial participation fee per permit. Each adopted location (i.e., per road, per spot or per neighborhood) requires a permit. | $50.00 | 62-18 | 11-20-2018 | |
Annual renewal fee for each permit | $25.00 | 62-18 | 11-20-2018 | |
150.47(A) | Annual fee for a building contractor’s pre-licensing registration | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 |
150.53( D) | Citation for doing business as building contractor without having registered | $50.00 | 26-93 | - -1993 |
150.53( F) | Subsequent violation within the same year, civil penalty | not less than $250.00 nor more than $2,500.0 0 | 26-93 | - -1993 |
150.65(C) | Demolition contractor registration | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 |
150.66(C) | Sign contractor registration | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 |
not to exceed $500.00 | 14-92 | - - | ||
151.24(C) | (6) Examination fee for applicants for electrical licenses | $50.00 | 1-95 | - -1996 |
151.24(I) | Electrical license fees: | |||
(1) Class A: | ||||
(a) New | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 | |
(b) Renewal | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 | |
(2) Class B | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 | |
151.24(J) | (3) Inactive electrical license fees | $25.00 | 1-96 | - -1996 |
151.25(A) | Re-inspection fee for electrical wiring work that does not pass inspection | $125.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 |
151.37(B) | (6) Examination fee for applicant for heating, air conditioning and ventilating contractor’s license | $50.00 | 1-96 | - -1996 |
151.37(I) | (1) New HVAC licenses | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 |
(2) License renewals | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 | |
151.37(J) | Inactive HVAC license fees | $25.00 | - | - |
Reinspection fee for woodburning stoves | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
Reinspection fee for plumbing installations that do not pass inspection | $40.00 | 82-11; 4-16 | 8-16-2011 ; 1-12- 2016 | |
Excavator registration fee | $125.00 | 118- 04; 4- 16 | 10-12- 2004; 1- 12-2016 | |
Preservation easement: | ||||
Filling fee, not to exceed | $50.00 | 51-05 | 5-10-2005 | |
Administration fee, not to exceed per year | $25.00 | 51-05 | 5-10-2005 | |
154.399 | Signs; fine for failure to remove, change or alter sign | $1,000.0 0 | 51-05 | 5-10-2005 |
Zoning violations: | 51-05 | 5-10-2005 | ||
All agricultural districts and residential districts: | ||||
The monetary fine for the first citation for a zoning violation shall be not less than: | $50.00 | 51-05 | 5-10-2005 | |
The following monetary fines shall apply for each subsequent citation: | ||||
Second citation; minimum | $100.00 | 51-05 | 5-10-2005 | |
Third citation; minimum | $200.00 | 51-05 | 5-10-2005 | |
Each additional | ||||
Not to exceed this increase in the previously assessed monetary fine | $300.00 | 51-05 | 5-10-2005 | |
Maximum monetary fine for each citation not to exceed | $2,500.0 0 | 51-05 | 5-10-2005 | |
All business/commercial districts and industrial districts: | ||||
The monetary fine for the first citation for a zoning violation shall be not less than: | $50.00 | 51-05 | 5-10-2005 | |
The following monetary fines shall apply for each subsequent citation: | ||||
Second citation; minimum per day until corrected | $100.00 | 51-05 | 5-10-2005 | |
Third citation; minimum per day until corrected | $200.00 | 51-05 | 5-10-2005 | |
Additional citation | ||||
Not to exceed this increase in the previously assessed monetary fine each day uncorrected | $300.00 | 51-05 | 5-10-2005 | |
Maximum monetary fine for each citation not to exceed | $2,500.0 0 | 51-05 | 5-10-2005 | |
All wireless telecommunications facilities; violation of § 154.458(A)(3) and (A)(5): | ||||
First citation | $100.00 | 51-05 | 5-10-2005 | |
Second day that the zoning violation goes uncorrected | ||||
Minimum | $100.00 | 51-05 | 5-10-2005 | |
Not to exceed | $150.00 | 51-05 | 5-10-2005 | |
Third day that the zoning violation goes uncorrected | ||||
Minimum | $100.00 | 51-05 | 5-10-2005 | |
Not to exceed | $200.00 | 51-05 | 5-10-2005 | |
Fourth day that the zoning violation goes uncorrected | ||||
Minimum | $100.00 | 51-05 | 5-10-2005 | |
Not to exceed | $250.00 | 51-05 | 5-10-2005 | |
Fifth day that the zoning violation goes uncorrected | ||||
Minimum | $100.00 | 51-05 | 5-10-2005 | |
Not to exceed | $300.00 | 51-05 | 5-10-2005 | |
Additional days | ||||
Minimum | $100.00 | 51-05 | 5-10-2005 | |
Not to exceed an increase per day in the previously assessed monetary fine for each day that the zoning violation remains uncorrected | $300.00 | 51-05 | 5-10-2005 | |
Maximum monetary fine for each zoning violation not to exceed per day that the zoning violation remains uncorrected | $2,500.0 0 | 51-05 | 5-10-2005 | |
ENVIRONMENTAL DIVISION FEE SCHEDULE
|
ENVIRONMENTAL DIVISION FEE SCHEDULE
| |
Septic | |
Cluster system installation | $1,000.00 |
Cluster system operating permit - (every 3 years) | $600.00 |
Commercial - (new and replacement construction) | $375.00 per year |
Commercial repair | $125.00 |
Contractor registration - (company) | $375.00 |
Health officer's report | $100.00 per lot ($700.00 max.) |
Inspector License - (licensed contractors do not pay) | $250.00 per year |
Installer License - (individual) | $150.00 per year |
Residential - (new and replacement construction) | $275.00 |
Residential repair - (tank only) | $100.00 |
Schematics/maps/drawings - (archived) | $10.00 |
Schematics/maps/drawings - (in house) | $5.00 |
Schematics/maps/drawings - (sent out to copy) | Actual cost |
Well Drilling | |
Commercial - (new and replacement construction) | $200.00 |
Contractor registration | $175.00 |
No well abandonment | $125.00 |
Non-potable/monitoring wells/geothermal | $60.00 per well ($360.00 max.) |
Residential - (new and replacement construction) | $175.00 |
Wellhead Protection | |
Small - (1 threat to groundwater) | |
Application fee - (every 3 years) | $125.00 |
Permit and inspection fee | $150.00 |
Medium - (2 or 3 threats to groundwater) | |
Application fee - (every 3 years) | $200.00 |
Permit and inspection fee | $275.00 |
Large - (more than 3 threats to groundwater) | |
Permit and inspection - (every 3 years) | $300.00 |
Permit and inspection fee | $400.00 |
Drywell Only | |
Application fee - (every 3 years) | $125.00 |
Annual permit and inspection fee | N/a |
Late fee | 25% per month |
CAFO | |
Permit - (every 5 years) | $600.00 |
Massage | |
Establishment | $225.00 per year |
Therapist | $100.00 per year |
Late fee | 25% per month |
Source Water Protection | |
Property transfer | $50.00 |
Tattoo and Body Piercing | |
Practitioner | $225.00 |
Establishment | $250.00 |
Permanent make-up | $250.00 |
Mobile facility | $250.00 |
Temporary | $100.00 |
Apprentice | $100.00 |
Late fee | 25% per month |
Trash | |
Trash hauler permit | $75.00 per truck per year |
Late fee | 25% per month |
Miscellanous | |
FOIA - request/parcel | $5.00 |
Copies | $0.10 per page |
Pursuant to Board of Health action, a 50% reduction with reference to environmental division fees will be given to municipalities and not-for profit organizations. | |
(Ord. 94-19, passed 12-3-2019; Am. Ord. 95-19, passed 12-3-2019; Am. Ord. 13-20, passed 2-11-2020)
FOOD SERVICES DIVISION FEE SCHEDULE
|
FOOD SERVICES DIVISION FEE SCHEDULE
| |
Annual Food Service/Store Establishment Permit | |
Gross Sales From/To: | |
$0.00 TO $49,999.99 | $75.00 |
$50,000.00 - $149,999.99 | $100.00 |
$150,000.00 - $249,999.99 | $125.00 |
$250,000.00 - $499,999.99 | $150.00 |
$500,000.00 - $749,999.99 | $200.00 |
$750,000 - $999,999.99 | $250.00 |
$ 1,000,000.00 - $ 1,249,999.99 | $300.00 |
$1,250,000.00 - $1,499,999.99 | $325.00 |
$1,500,000.00 - and up | $375.00 |
*Late Fee | 75% cost of permit |
Lost/stolen/destroyed permit | $25.00 |
*Late fee will be charged for: 1. Retail Food Establishments who fail to apply for a permit before operating an establishment. 2. For not obtaining the permit by the renewal date of January 31. 3. Retail Food Establishments who fail to obtain their permit within one week of receiving permit approval from the opening inspection. | |
Plan and Review - Application for Permanent Establishment Food Service/Store (Includes $50.00 application fee) | |
Under 3,000 square feet | $100.00 |
3,001 to 30,000 square feet | $180.00 |
30,001 to 40,000 square feet | $260.00 |
40,001 to 60,000 square feet | $340.00 |
60,001 square feet and over | $400.00 |
New Business and/or Ownership Change of Establishment | |
Administration/application fee | $75.00 |
Permit fee based on estimated gross sales | See annual food service/store establishment permit above |
Additional consultation or inspection fee | $35.00 per visit |
New Construction - Failure to Notify the Department of Health (Plan and Review must also be submitted) | |
Late Fee | Fine equal to cost of required plan and review |
Change in Ownership - Failure to Notify Department of Health (New permit must also be applied for) | |
Late fee | 75% cost of permit |
Temporary Permit | |
One day event | $30.00 |
Two to three pay event | $50.00 |
Four to ten day event | $130.00 |
Annual permit | $375.00 per year |
Late fee | 100% cost of permit |
Vending | |
All machines | $10.00 per machine |
Lost/stolen/destroyed permit | $5.00 |
Mobile Food Establishments - (Trucks) | |
Pre-packaged items - (i.e. Summer Song, Butcher's Best) | $100.00 per unit |
Dispensing only - (i.e. Cupcakes, etc.) | $325.00 per unit |
Food prep in unit - (i.e. Taco, Pulled Pork, Etc.) | $375.00 per unit |
Seasonal Mobile | |
Push carts - (i.e. Hot Dog and Ice Cream Push Carts) | $100.00 per unit |
Probation | |
Probationary fee when placed on probationary status | $200.00 |
Miscellaneous | |
ISDH Certification of Food Handler Requirements (410 I AC 7-22) | $5.00 |
St. Joseph County food ordinance | $5.00 |
Copies | $0.10/page |
Swimming Pools and Spas (January - December) | |
Public Swimming Pool | $135.00 |
Public Wading Pool | $75.00 |
Spa | $80.00 |
Late Fee | 75% cost of permit |
Summer Time Pools (May - September) | |
Public swimming pool | $75.00 |
Public wading pool | $50.00 |
Spa | $55.00 |
Late fee | 75% cost of permit |
Government and Schools | |
Public swimming pool | $75.00 |
Public wading pool | $50.00 |
Spa | $55.00 |
Late fee | Exempt |
Pool Regulations | |
County, ISDH plus VGB | $5.00 |
(Ord. 95-19, passed 12-3-2019)
HEALTH OUTREACH, PROMOTION AND EDUCATION DIVISION FEE SCHEDULE
| |
Blood Borne Pathogen Certification Class* | |
Individual | $10.00 per person |
Organization/Agency 5-15 participants/class | $50.00 |