It is the purpose of this section to establish and define the public improvements which will be required to be provided by the proprietor as conditions for final plat approval.
(A) All water, sanitary sewer, storm drainage, street and sidewalk improvements shall comply with the city’s engineering and construction standards.
(B) (1) Accessible public drainage system. Where a storm drain is reasonably accessible, each lot within the subdivided area shall be provided with a connection thereto. All connections shall be subject to the approval of the City Engineer and all materials used in such system shall be subject to current city specifications.
(2) Non-accessible public drainage system. In the event that a public storm drain is not reasonably accessible to the subdivision, the subdivider shall pay the cost of extending the storm sewer lines from the area platted to the nearest public storm sewer trunk of adequate size to carry additional flow. In addition, the subdivider shall install public storm drain facilities within the platted area in accordance with the current city specifications.
(3) Existing trees near street rights-of-way shall be preserved by the subdivider. Street trees from the varieties listed in the city specifications on file with the City Clerk shall be provided at least one per lot in the planting strip between the sidewalk and curb and planted by the proprietor in accordance with the aforesaid city tree planting specifications.
(C) Monuments shall be placed at all block corners, angle points and points of curves in the street. Fee for the inspection by the city of all monuments shall be set by resolution of the City Commission.
(Ord. 509, passed 4-22-2002)