(a) All utility easements, when located outside of the right-of-way of streets, must be twenty (20) feet wide or as otherwise determined by the responsible agency except that utility easements adjacent to street rights-of-way may be reduced to ten (10) feet in width.
(b) Where necessary, utility easements may be required along side or rear lot lines.
(c) All Final Plats shall contain a notice requiring the notification of utility companies at least two (2) working days before initiating excavation, drilling or blasting activities.