§ 50.05 CHARGES FOR SERVICE CONNECTIONS.
   (A)   Electrical service connection permit and fees.
      (1)   Connection may be made to the city electric utility only after electrical affidavit is received by city and Electric Superintendent approves application.
      (2)   The City Council shall adopt a schedule of fees for electrical service connection permits from time to time.
      (3)   For electrical service connection fees, see § 54.09.
   (B)   Sewer and water service connection fees.
      (1)   The City Council shall adopt a schedule of fees for sewer and water service connection from time to time.
      (2)   When a sewer or water connection requires installing a service line from the main to the property line the applicant shall provide for the service line installation in accordance with city specifications, including all costs for installation, street repairs, curb repair, and property landscaping.
   (C)   Determination of adequacy.
      (1)   No connection to any city utility shall proceed until the Public Works Director has determined that adequate utility service exists serving the property, or that proper provisions for installing adequate service have been made.
      (2)   An assessment project or bond by a contractor is required to ensure the project will be completed. Adequacy of main service shall be determined according to the main extension policies the Council adopts by resolution.
(1987 Code, § 301.05) (Am. Ord. 639, passed 6-28-2022)
Cross-reference:
   For definition of sewer connection, see § 52.01