1117.05 MAP CONTENTS.
   (a)   The final plan shall contain the following information:
      (1)   Name of the subdivision. Location by section, town, range, township, county, state, scale, date and north point.
      (2)   All plat boundaries with length of courses to 1/100 feet and bearings to half minutes. When required by the Village Engineer, all calculations and field notes shall be submitted.
      (3)   Existing contours with intervals of not more than five feet, where the slope is greater than ten percent (10%) and not more than two feet where the slope is less than ten percent (10%). Elevations are to be based on sea level datum.
      (4)   Bearings and distances to the nearest established street lines, section corners or other recognized permanent monuments, which shall be accurately described on the plat.
      (5)   Municipal, township, county or section lines accurately tied up to the lines of the subdivision by distances and bearings.
      (6)   Names of streets within the adjoining plat.
      (7)   Length of all arcs, chord and chord bearings, radii, internal angles, points of curvature, and tangent bearings.
      (8)   All easements for right-of-way provided for public services or utilities, and any limitations of such easements.
      (9)   All lot numbers and lines, with accurate dimensions in feet and hundredths, and with bearings or angles to street and alley or crosswalk way lines.
      (10)   Accurate location of all monuments.
      (11)   Accurate outlines of any areas to be dedicated or temporarily reserved for public use with the purpose indicated thereon.
      (12)   Building setback lines, with dimensions.
      (13)   When lots are located on a curve or when side lot lines are at angles other than ninety degrees, the width at the building lines shall be shown.
         (Ord. 29-1967. Passed 9-7-67.)