§ 150.059 WASTEWATER AND SOIL CUT PERMITS.
   Receipt for county wastewater and soil cut permit: permit is required before footings are poured. The final permit shall be on file with the town before a certificate of occupancy is issued.
(Prior Code, § 6.03.040)