11-2-17: FLOOD CONTROL FACILITIES:
   A.   Design: Flood control facilities including flood channels, flood easements and storm drains will be designed to provide adequate protection against a 50-year flood and shall be approved by the public works director.
   B.   Streets; Highways: Streets and highways shall not be used as flood channels. (2006 Code)