§ 156.05 REVIEW OF PERMIT APPLICATION.
   (A)   The responsible person shall review all applications for a permit required under this chapter to determine whether proposed building sites will be reasonably safe from flooding.
   (B)   If a proposed building site is in a flood prone area, all new construction and substantial improvements (including the placement of manufactured homes) shall be:
      (1)   Designed (or modified) and adequately anchored to prevent floatation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy;
      (2)   Constructed with materials and utility equipment resistant to flood damage;
      (3)   Constructed by methods and practices that minimize flood damage, and
      (4)   Constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(Prior Code, § 154.05)