§ 153.079 LAND RECLAMATION.
   All land reclamation shall meet the following standards:
   (A)   The smallest amount of bare ground is exposed for as short a time as feasible;
   (B)   Temporary ground cover is used and permanent ground cover, such as sod, is planted;
   (C)   Methods to prevent erosion and trap sediment are employed;
   (D)   Fill is stabilized to accepted engineering standards;
   (E)   Final slopes for cut slopes should be a maximum of 1:1; or 100%; fill slope 3:1 or 30%; and grade or construction slope, 5:1 or 20%.
(Prior Code, § 904.14)