(A) Easements having a minimum width of 10 feet shall be provided along the side or rear lot lines as required for utility lines and underground mains and cables.
(B) Utility easements shall connect with easements established in adjoining properties. All utility easements should be reviewed by the appropriate utility company or corporation. Where feasible, all utilities shall be placed underground.
(C) Where a subdivision is traversed by a water course, drainage way, channel or strain, there shall be provided a floodage easement or drainage right-of-way conforming substantially with the lines of such water course.
(D) Pedestrian walkway easements with right-of-way of not less than 10 feet in width shall be required where deemed essential to provide circulation or access to schools, playgrounds, shopping centers, transportation and other community facilities as shall be determined by the Planning Commission and Council.
(Prior Code, § 1001.05)