If a proposed building site is located in a floodprone area, all new construction and substantial improvements (including the placement of MANUFACTURED HOMES) shall conform to the following standards.
(A) Anchoring. All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure, and capable of resisting hydrostatic and hydrodynamic loads.
(B) Construction materials and methods.
(1) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
(2) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
(3) All new construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(C) Utilities.
(1) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.
(2) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharge from the systems into flood waters.
(3) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(D) Subdivision proposals.
(1) All subdivision proposals shall be consistent with the need to minimize flood damage.
(2) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage.
(3) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage.
(Prior Code, § 4.0805) (Ord. 431, passed - -1997)