§ 9-103 BUILDING INSPECTOR; PERMIT LIMITATION.  
   If the work for which a permit has been issued shall not have begun within six (6) months of the date thereof, or if the construction shall be discontinued for a period of six (6) months, the permit shall be void. Before work can be resumed, a new permit shall be obtained in the same manner and form as an original permit.