To receive final inspection and a determination by the City that the approved Comprehensive Stormwater Management Plan and the requirements of this regulation have been complied with in performing a construction project, the following must be completed:
(a) All permanent stormwater management facilities must be installed, free of debris, and made functional per the approved Comprehensive Stormwater Management Plan.
(b) An as-built survey, sealed, signed and dated by a Professional Surveyor and a written certification by a Professional Engineer certifying that permanent stormwater management facilities, as designed and installed, meet the requirements of the approved Comprehensive Stormwater Management Plan shall be delivered to the City. The as-built survey must provide the location, dimensions, details, volume, and bearing of such facilities. In evaluating this certification, the City may require the submission of a new set of stormwater calculations if the City determines that the design was altered materially from the approved Comprehensive Stormwater Management Plan.
(Ord. 19-289. Passed 12-10-19.)