927.05 CITY ENGINEER'S ACCEPTANCE OF UTILITY INFRASTRUCTURE.
   After the water and sanitary sewer infrastructure has been constructed within the New Condominium Development, the owner of the New Condominium Development shall prepare and deliver to the City Engineer as-built drawings for the said water and sanitary sewer infrastructure and a deed of easement as approved in the Section 927.03 procedure, with necessary changes made due to approved plan deviations allowed by the City Engineer. If the City Engineer determines that the said water and sanitary sewer infrastructure has been constructed in compliance with the approved New Condominium Development water and sanitary sewer utility plan, the City Engineer shall certify his acceptance of the said water and sanitary sewer infrastructure to the City Commission and request acceptance of dedication of the easement and the water and sanitary sewer infrastructure described in the deed of easement. The City shall assume operation and maintenance responsibilities for the water and sanitary sewer infrastructure only:
   (a)   upon acceptance of dedication of the easement and water and sanitary sewer described in the deed of easement,
   (b)   upon the deed of easement being recorded, and
   (c)   upon the City receiving from the owner's attorney his certification that the said easement is free and clear of all encumbrances and that all mechanic's liens which could attach to the easement and the water and sanitary sewer infrastructure located in the easement have been waived.
      (Ord. 97-148. Passed 4-29-97.)