The following standard methods of measurement are used in applying the dimensional requirements established in this Ordinance.
(a) Minimum Yard Setback Requirements. The minimum yard setback requirements listed in Table 4 shall be measured from the property line or the edge of the planned right-of-way in the Mobility Master Plan (Chapter 1226), existing right-of-way if a planned right-of-way does not exist, or road or highway easement when the property line extends to the centerline of the road, unless specifically noted otherwise.
(b) Measurement of Building Setbacks. When a building contains an overhang, eave or similar projection, the minimum yard setback for such building shall be measured from the edge or outer most portion of said overhang, eave or similar projection.
(c) Yard and Open Space Calculations. No space which has already been calculated as part of any required yard (front, side or rear) or open space for a building, lot or development shall be used again to satisfy the same requirements for any other building, lot or development.
(Ord. 0-15-4. Passed 2-19-15.)