§ 158.13 CONSTRUCTION REQUIREMENTS.
   During construction, the applicant shall demonstrate that the following requirements are being met:
   (A)   Dust control. Reasonable dust control measures shall be required by the Board of Commissioners during construction of a commercial WECS;
   (B)   Drainage. Reasonable storm water best management practices as required by the approved drainage plan/agreement on file with the County Surveyor; and
   (C)   Executive Director. No individual sheet or drawing shall exceed 24 inches by 36 inches.
(Ord. 2022-02, passed 4-5-2022)