(A) The county shall contract with the state for the making, constructing, and erecting of load limit signs for all bridges with a maximum load limit of less than 15 tons shown on such report of AECON, Inc., as revised and presented to the Board of Commissioners.
(B) The maximum load limits for all of such bridges, as shown upon said report, be, and the same are, hereby adopted by the Commissioners and made the absolute maximum load limits for each of such respective reports. Such report, as revised, is so adopted and incorporated by reference herein, and made a part hereof. A copy of such report is on file with the County Auditor, and is available for inspection during regular court house hours.
(Ord. 84-8, passed 10-22-1984)