§ 53.060 TECHNICAL SPECIFICATIONS.
   The size, slope, alignment, materials of construction of all sanitary sewers, including building sewers, and the methods to be used in excavating, placing of the pipe, jointing, testing and back-filling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. In the absence of suitable code provisions or in application thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
(Prior Code, § 18-136) (Ord. 511, passed 9-20-1982)