(A) (1) Prior to occupying a new structure, using land in a different intensity than before, or occupying an existing structure or parcel or property with a new type of use other than what previously existed, a certificate of occupancy must be obtained from the township.
(2) The certificate of occupancy is granted after an inspection and is intended to ensure zoning compliance.
(B) The certificate of occupancy is intended to make sure that:
(1) After construction, the newly developed structure is the one that has been approved;
(2) Before occupancy, a new use is the same as the use that was approved; and
(3) Both structure and use comply with all zoning requirements and any conditions previously imposed.
(Ord. passed 7-12-2012, § 14.6)