Within 30 days after the time when any water main in any street is completed and ready for use, the owner of every abutting lot whereon water is supplied for any human use shall cause the lot to be connected with the water main; and within 30 days after the time any sewer main in any street is completed and ready for use, the owner of every abutting lot having improvements thereon shall cause all water closets, bathtubs, lavatories sinks and drains upon the lot to be connected with the sewer main.
(Prior Code, § C.1.05) Penalty, see § 10.99