(A) No non-agricultural building or structure shall be erected, added to or structurally altered until a permit has been issued by the Building Inspector. Except upon a written order of the Board of Appeals no building permit shall be issued for any building where the construction, addition or alteration or use thereof would be in violation of any of the provisions of this chapter. No agriculture building or structure exceeding $500 in cost shall be erected, added to or structurally altered until a permit has been issued by the Building Inspector without charge. The permit shall be issued upon compliance by the applicant with the building setback line.
(B) There shall be submitted with all applications for building permits of non-agricultural buildings or structures two copies of a layout or plat plan drawn to scale showing actual dimensions of the lot to be built upon, the exact size and location on the lot of the building and accessory buildings to be erected and other information as may be necessary to determine and provide for the enforcement of this chapter.
(C) One copy of the layout or plot plan shall be returned when approved by the Building Inspector together with the permit to the applicant.
(1994 Code, § 155.181) (Ord. 200, passed 4-28-1969)