Every applicant for approval of a preliminary PUD development plan shall submit to the Code Enforcement Officer, in narrative and/or graphic form, the items of information listed below:
(A) Legal description of the total site proposed for development;
(B) Names and addresses of all owners of property within or adjacent to the proposed PUD;
(C) Statement of the planning objective to be achieved by the PUD through the particular approach proposed by the applicant, including a description of the character of the proposed development and the rationale behind the assumptions and choices made by the applicant;
(D) Development schedule indicating the approximate date when construction of the PUD or phases of the PUD can be expected to begin and be completed;
(E) Statement of the applicant’s intentions with regard to the future sale or lease of all or portions of the PUD site;
(F) Date indicating:
(1) Total number and type of proposed building units;
(2) Gross and net acreage of parcel;
(3) Acreage of gross and usable open space; and
(4) Area of various uses.
(G) Existing site conditions including contours at five-foot intervals and locations of watercourses, floodplains, wetlands, unique natural and human-made features and wooded areas;
(H) Proposed lot lines and plot designs;
(I) Proposed location, size (square foot) and general appearance of all existing and proposed buildings and other structures and uses;
(J) Location and size (acreage or square feet) of all areas and facilities conveyed, dedicated or reserved as common open spaces, public park and/or recreation areas, linear paths and similar public and semi-public uses;
(K) Existing and proposed vehicular circulation system, including off-street parking and loading area and major points of ingress and egress to the development (notations of proposed ownership, public or private, should be included where appropriate);
(L) Existing and proposed pedestrian and other specially identified circulation systems, including their relationship to the vehicular circulation system and proposed treatments of points of conflict;
(M) Existing and proposed utility systems including sanitary and storm sewers, water, electric, gas, cable and telephone lines;
(N) General landscape plan indicating the treatment of both private and common open spaces and the location of required buffer strips;
(O) Enough information on land area adjacent to the proposed PUD to indicate the relationships between the proposed development and existing and proposed adjacent areas; and
(P) Any additional information required by the city to evaluate the character and impact of the proposed PUD.
(1994 Code, § 154.54-1) (Ord. 2003-05, passed 7-28-2003)