(a) Concrete bases shall be smooth and consist of undisturbed or compacted earth. A stone, gravel or limestone screening or other nonsettling material approved by the Building Inspector may be used as a leveling course. Excavations or trenches under a drive must be compacted or filled with a nonsettling material.
(b) Subgrades or bases shall be dampened, if dry, before pouring.
(Ord. 1982-34. Passed 11-8-82.)