(a) A curing compound must be applied immediately after broom finishing without damaging the surface, in accordance with the manufacturer's recommendations.
(b) Calcium or other admixtures shall not be added at the job site.
(c) Minimum floating and finishing is required. A broom finish is required. Finishing must be delayed until the water sheen (bleed water) has disappeared from the surface. (Ord. 1982- 34. Passed 11-8-82.)