1024.08 SEWER TIE-INS.
   No person shall use a septic tank sewage disposal system or an on-site sewage disposal system where a public sewer is available and accessible.
   Every dwelling house and every building designed for, or occupied by, persons in the Village shall be separately connected with the public sewerage system.
   In cases of new sewer construction or extensions to the sewerage system, the required tie-in shall be effected within six months from the date of acceptance of the sewer by the County or other appropriate agency.
(Ord. 1979-21. Passed 4-23-79.)