§ 154.117 CHECKLIST FOR FINAL PLAT.
   The following is the checklist for final plat:
   (A)   ________________________________________ (Name of Subdivision)
   (B)   _________________________________________(Date of Submission)
   (C)   _________________________________________(Due Date of Recommendation 30 Days)
   (D)   (NOTE: To properly execute this checklist, the subdivider or his or her engineer shall:
      (1)   Insert the required information.
      (2)   Denote compliance with applicable ordinances by placing his or her initials in all spaces where applicable.
      (3)   Denote those items which the subdivider considers "not applicable" to this particular subdivision by the abbreviation "N.A.".)
         (a)   ________   Plat has been submitted within six months after the approval of the engineering plan.
         (b)   ________   Plat has been submitted within three years after the approval of the preliminary plan [unless an extension of time has been requested of and granted by the Village Board).
         (c)   ________   One (1) original drawing of the final plat has been submitted.
         (d)   ________   One (1) transparency print of the final plat has been submitted.
         (e)   ________   Four (4) copies of the final plat have been submitted.
         (f)   ________   Plat is drawn with black or blue ink on heavy linen tracing cloth or polyester film.
         (g)   ________   North direction is shown.
         (h)   ________   Scale is shown (minimum 1" equals 100').
         (i)   ________   Section corners and section lines are accurately tied into subdivision by distances and angles.
         (j)   ________   Official survey monuments are shown as required.
         (k)   ________   All necessary easements are shown and dimensioned.
         (l)   ________   Building setback lines are shown and dimensioned in accordance with the Zoning Code.
         (m)   ________   Lot areas are in accordance with the applicable Zoning Regulations.
         (n)   ________   Street names are shown.
         (o)   ________   Areas to be dedicated or reserved for public use are shown and described and the purpose is designated.
         (p)   ________   Protective covenants are lettered on the plat or are appropriately referenced.
         (q)   ________   Required certificates are shown and signed:
            1.   ________   Surveyor's Certificate (including legal description).
            2.   ________   Owner's Certificate.
            3.   ________   Notary Certificate.
            4.   ________   County Clerk's Certificate.
            5.   ________   Flood Hazard Certificate.
            6.   ________   Plan Commission Certificate.
            7.   ________   City Council Certificate.
            8.   ________   Superintendents' of Water, Sewer and Streets Certificate.
         (r)   ________   The following items have been submitted with the final plat:
            1.   ________   Detailed specifications for all required land improvements not previously submitted and approved with the engineering plans.
            2.   ________   A copy of the State Sanitary Water Board permit for the sanitary sewer installation.
            3.   ________   A copy of the State Department of Public Health approval of the water main installation.
            4.   ________   An affidavit by the subdivider acknowledging responsibility for the proper installation of all required land improvements.
            5.   ________   A certified estimate of cost of all required land improvements prepared by a registered engineer.
            6.   ________   A description of the bond or guarantee collateral intended to be submitted after contingent approval is granted by the municipality.
Completed by: _________________________________________________________________ (Name)
___________________________________________________________________________ (Address)
_____________________________________________________________________________ (Date)
Reviewed by: ______________________________________________________(Zoning Administrator)
______________________________________________________________________________ (Date)
Considered by Plan Commission On: ________________________________________________ (Date)
___________________________________________________________________________ (Chairman)
(1994 Code, § 34-6-3)