§ 150.06 BUILDING PERMIT FEES AND EXPIRATION.
   The fees for building permits, including electrical permits, shall be as set forth in this section. Building permits issued under this section shall be valid for a period of six months from the date of issuance. If the work authorized by the permit is not commenced within six months from the date of issuance or is not completed within the same period, the permit shall expire and become null and void. A new permit application and payment of fees shall be required for any work to be recommenced or completed.
   (A)   Permit fees shall be as follows:
Main building or structure (the building or structure serving the main purpose of the property)
   *plus $0.10 per square foot on commercial or industrial buildings
$250
Detached garages and building additions
 
   Without electrical
$75
   With electrical
$100
Accessory building and structures
 
   Without electrical
$75
   With electrical
$100
Radio and television antennas, mast and/or tower types
(including satellite dishes)
$50
Fireplaces (all types put in separately)
$75
V.A. and F.H.A. requested inspections
$50
Swimming pools
 
   Above-ground pool
$50
   Below-ground pool
$100
Mobile home rates
$100
Rewiring and upgrading wiring
$75
Demolition fees
$500
Construction trailer permit (maximum of 90 days)
$100
   Electrical inspections
 
   Permit
$75
Each additional inspection after the first inspection fails
$50
 
   (B)   The fees for electrical permits shall read as follows:
      (1)   A $75 permit shall be required prior to any upgrade of service or change of service made to any existing installation of electrical wiring or equipment.
      (2)   A $75 permit shall be required prior to any upgrade of service and re-wiring to any existing installation of electrical equipment.
   (C)   Other electrical permit fees.
Residential (new construction)
 
   Single family up to 200 amp
$75
   Single family up to 400 amp
$85
   Single family over 400 amp
$100
Residential
   (minor alterations up to 30 outlets and max. 200 amp service one visit)
$45
Services
 
   Up to 200 amps
$50
   201 to 400 amps
$75
   401 to 1,200 amps
$100
   Over 1,200 amps
$140
Feeders and panel boards
 
   200 amps or less
$20
   Up to 400 amps
$25
   Up to 1,200 amps
$30
   Over 1,200 amps
$35
Transformer, vault enclosures and substations
 
   Up to 200 Kva
$75
   Up to 500 Kva
$100
   Up to 1,000 Kva
$150
   Over 1,000 Kva
$200
Rough wire
 
   One to 100 outlets
$45
   Each additional 20
$10
   Minimum inspection fee
$55
Signaling systems
 
   Residential
$30
   115 volt smoke detector with battery
$15
   Other than residential
$75
Pools, spas and hot tubs
 
   Above ground, one visit
$50
   In ground, two visits
$100
Manufactured homes
 
   One visit
$75
Heating and air conditioners
 
   30 Kw or less
$50
   Over 30 Kw
$60
   Each additional unit
$25
Signs
 
   First sign
$35
   Each additional sign
$10
Motors, generators, transformers
 
   One to 50 HP or Kw, first unit
$50
   Each additional unit
$15
   51 to 100 HP or Kw
$65
   Each additional unit
$20
Final wiring
 
   One to 100 outlets
$45
   Each additional 20
$10
 
   (D)   A $25 non-refundable building permit application fee will be charged to all applicants upon initiating a building permit application. If the permit is granted, the application fee will be applied to the total building permit fee.
(Ord. 21-01, passed 4-13-2021; Ord. 23-04, passed 3-4-2023)