(A) The following schedule of fees shall be administered by the Town Manager or his/her designee.
Description | Fee |
Description | Fee |
Sign Making Street name sign and post (includes installation) | |
Single blade | Replacement cost plus 20% |
Double blade | Replacement cost plus 20% |
Stop, yield and the like | Replacement cost plus 20% |
Handicapped parking signs (including maximum penalty sign) | Replacement cost plus 20% |
Van-accessible sign | Replacement cost plus 20% |
"U" channel posts | Replacement cost plus 20% |
Decorative street sign/post | Replacement cost plus 20% |
Construction Inspection | |
Street and fire lane construction | $2.00 per linear foot, $150 minimum |
Sidewalk and greenway construction | $0.75 per linear foot, $150 minimum |
Storm-line construction | $1.00 per linear foot, $150 minimum |
Curb and gutter construction | $0.75 per linear foot, $150 minimum |
Water construction | $1.25 per linear foot, $150 minimum |
Sewer construction | $1.25 per linear foot, $150 minimum |
Unusual improvements | $45 per hour |
Sanitation | |
Waste disposal (per residential unit) (Waste disposal fee covers the collection and disposal of solid waste, recycling, yard debris, and bulk items) | $17.25 per month (effective July 1, 2023) |
Waste disposal (per commercial unit) (Waste disposal fee covers the collection and disposal of solid waste and recycling) | $20.00 per month (effective July 1, 2023) |
Street Repairs | |
Asphalt cut repair Up to 300 square foot Over 300 square foot at 1 location | $5 per square foot Cost plus 20% |
Sidewalk repair Up to 100 square foot Over 100 square foot | $7 per square foot Cost plus 20% |
Curb and gutter repair Up to 50 linear foot Over 50 linear foot | $29 per linear foot Cost plus 20% |
Soil erosion and sedimentation control plan review processing fee | |
First acre | $300 |
Each additional acre, or part thereof | $150 |
Substantial revision to previously approved or active plan | $50 per acre or part thereof |
Revised plan review fee - after second review and beginning with the third review | $50 each submittal |
Equipment | Charge Per Hour |
Equipment | Charge Per Hour |
Pick-up truck | $20 |
One-ton truck | $35 |
Dump truck | $55 |
Backhoe/mini-excavator | $75 |
Skid steer loader | $50 |
Street sweeper | $150 |
Combination jet/vacuum truck | $300 |
Tractor with attachments | $50 |
Air compressor | $35 |
Asphalt recycler | $150 |
ATV/UTV | $30 |
Zero-turn mower | $25 |
Aerial lift | $20 |
Wood chipper | $50 |
Dewatering pump | $15 |
Asphalt roller | $30 |
Concrete mixer | $40 |
Chain saw | $15 |
Pipe saw | $15 |
Floor saw | $25 |
Tamp | $20 |
Trench roller | $65 |
Wet tap | $25 (per use) |
Labor | Charge Per Hour |
All staff | Cost plus 20% |
(B) The charges prescribed for waste disposal in division (A) above shall apply to each unit within the Town. The unit is hereby defined as any residence, dwelling unit, an apartment, trailer or household occupied by a single family or any store, motel, theater, school, office building or other commercial enterprise receiving garbage collection service from the Town. A separate unit charge shall apply for each family or section.
(C) The monthly charge will be billed by the Town to each unit each month and should be payable with the Town water and sewer billing within the time limits fixed for the payment of the utility bill.
(D) If any charge shall not be paid as provided hereinbefore, then the Town may discontinue further collection and removal of the garbage, refuse and trash from the unit involved and the further retention of the garbage, refuse and trash on the property involved shall be unlawful and shall subject the resident of the unit and the owner of the properties to all applicable health and sanitation regulations and laws.
(E) The person or organization in whose name utility service is listed shall be liable for and shall pay the charges for refuse service provided for under this section.
(F) Any payments received for the utility bill which may include water, sewer and/or waste disposal shall be applied to waste disposal charges first with the remaining payment applied to water and/or sewer charges.
(1989 Code, § 32.51) (Ord. 142, passed 6-26-1989; Am. Ord. passed 12-11-1990; Am. Ord. 263, passed 11-12-1991; Am. Ord. 395, passed 7-13-1993; Am. Ord. 910, passed 4-10-2001; Am. Ord. 1119, passed 4-13-2004; Am. Ord. 1294, passed 6-10-2008; Am. Ord. 1378, passed 6-8-2010; Am. Ord. 1423, passed 6-14-2011; Am. Ord. 1475, passed 6-12-2012; Am. Ord. 1505, passed 6-11-2013; Am. Ord. 1543, passed 6-10-2014; Am. Ord. 1668, passed 6-13-2017; Am. Ord. 1740, passed 6-12-2018; Am. Ord. 1804, passed 6-11-2019; Am. Ord. 1864, passed 6-9-2020; Am. Ord. 1934, passed 6-8-2021; Am. Ord. 2008, passed 6-14-2022; Am. Ord. 2068, passed 6-13-2023)