§ 152.108 SKIRTING.
   (A)   Skirting of mobile homes is required with 90 days of arrival at park with commercial skirting material by mobile homeowner. Any mobile home not skirted after 180 days will result in the business licensee being subject to penalties set forth in § 152.999. Extensions may be granted by the Mobile Home Inspector or staff if proof of extenuating circumstances can be documented in writing that prevented the owner from under skirting the mobile home.
   (B)   For health, safety, energy conservation and aesthetic purposes, skirting and ventilation with an access door underneath all living areas is required within 60 days of foundation approval.
   (C)   Skirting shall be maintained in a good state of repair.
   (D)   Lattice, treated or untreated wood or vinyl is not an acceptable skirting material.
   (E)   Skirting must have an access door (minimum 18 inches by 24 inches) and must be properly vented. The minimum net ventilation openings shall not be less than one (1) square foot for each 150 square feet of under floor space area. One (1) vent shall be within three (3) feet of each corner.
   (F)   All skirting must be the same pattern throughout the mobile home park.
(1985 Code, § 6-74) (Am. Ord. 2019-09, passed 12-10-2019) Penalty, see § 152.999