Prior to commencing work, the permittee will be responsible for having all utilities, including cable, electric, telephone, water, gas and steam service, for each structure shut off and utility lines removed from the building in accordance with the requirements of this chapter and the utility companies involved. All sewer connections from the demolished building shall be bulkheaded at a point specified by the Engineering Department. It is the responsibility of the permittee to see that an inspector from the Engineering Department is present at the time of bulkheading the sewer connections. Any damage done to any curb, sidewalk or pavement, water connections, gas mains, telephone ducts, power ducts or any public utility not mentioned, in the street’s right-of-way during the sewer connection bulkheading operation, is the responsibility of the permittee and must be replaced or repaired at no cost to the city. Any repair or replacement of the above-mentioned items must be done to the satisfaction of the utility and the city.
(Ord. 1979-12, passed 2-5-1979; Ord. 2005-152, passed 6-20-2005)