§ 1250.24 FENCING OF RETENTION AND SEDIMENT BASINS.
   In any subdivision where, in the judgment of the City Engineer, the developer is required to install a permanent retention or sediment control basin, the City Engineer shall also require fencing of the basin with a six-foot high chain-link fence, wherever practical.
(Res. 1987-230, passed 11-16-1987)