11-4-5: DATA REQUIRED:
The following additional data shall be shown on each final map:
   A.   Dates: Dates of survey and preparation of map.
   B.   Street Names And Locations: Locations and names, without abbreviations, of all proposed streets and alleys; proposed public areas and easements; adjoining streets.
   C.   Lot Dimension: Dimensions of all lots; lots containing one acre or more shall show net acreage to the nearest hundredth of an acre. Ditto marks shall not be used.
   D.   Street Lines And Lengths: Center lines of all streets and lengths, tangent radius and central angle or radial bearings of all curves; and the bearings of radial lines to each lot corner of a curve; the width of each street, the width of the portion being dedicated and the width of existing dedication.
   E.   Line Bearing And Length: Sufficient data to determine readily the bearing and length of each line.
   F.   Survey Control Points: Suitable primary survey control points.
   G.   Adjacent Subdivision Ties: Ties to and recording references to adjacent subdivisions and section corners, or two (2) known monuments as appropriate.
   H.   Easement Data: Center line data, width and side lines of all easements to which the subdivision is subject. Distances and bearings on the side lines of lots which are cut by an easement shall be shown as to indicate clearly the actual lengths of the lot's lines. The width of the easements and the lengths and bearings of the lines thereof and sufficient ties to locate the easements definitely with respect to the subdivisions shall be shown. The easement shall be clearly labeled and identified and, if already of record, proper reference to the records given. Easements being dedicated shall be so indicated in the certification of dedication. Easements shall be shown on the map by broken lines.
   I.   Boundary Evidence: Clear indication of stakes, monuments or other evidence on the ground to determine the boundaries of the subdivision. (1986 Code § 13-5-5)