§ 153.093 APPLICATION AND ISSUANCE OF ZONING CERTIFICATES.
   (A)   Written application for a zoning certificate for the construction of a new building or for the alteration of an existing building shall be made to the Zoning Inspector. The certificate shall be issued within ten days after written request for the same has been made to the Zoning Inspector or his or her agent, provided the construction or alterations is in conformity with the provisions of this chapter.
   (B)   Written application for a zoning certificate for the use of vacant land or for a change in the use of land or of a building or for a change in a non-conforming use, as herein provided, shall be made to the Zoning Inspector. If the proposed use is in conformity with the provisions of this chapter, the certificate therefore shall be issued within 15 days after the application for same has been made.
   (C)   Every application for a zoning certificate shall be accompanied by a plot plan drawn to scale and such other plans as may be necessary to show the location and type of buildings to be erected or alterations to be made.
(Ord. 76-43, passed 12-13-1976)