§ 152.080 EROSION AND SEDIMENTATION CONTROL.
   (A)   Measures shall be taken to minimize erosion and its impacts during subdivision construction activity. Detailed erosion control plans setting forth the techniques to be used both temporarily (during construction) and permanently, and a schedule for implementing or installing same shall be submitted with the final plat. All erosion control devices shall be in place at the start of construction and other measures implemented according to the approved time schedule.
   (B)   Erosion control plans shall be based designed to control erosion on-site, with the object of eliminating or minimizing erosion or sedimentation impacts off site. Techniques, devices, or measures used shall be in accordance with the standards adopted by the village and meet all requirements for stormwater NPDES permits. A stormwater NPDES permit shall be obtained prior to construction.
(Ord. passed 5-10-2001)