§ 150.051  APPROVED PAPERS.
   All approved drawings, specifications, and other papers filed with the application for a permit shall be stamped or endorsed by the Building Inspector.  One set shall be returned to the applicant for a permit, and the certified copies of the same shall be kept on the building or work until the same has been completed.  True copies of all or as many of the drawings, specifications, and statements as may be required in the opinion of the Building Inspector to illustrate the features of construction and equipment of the building referred to in this chapter, shall be retained by him and shall become records of his office.
('91 Code § 150.036)  (Ord. 2203-1966, passed 2-2-67)