§ 153.355  RIGHT-OF-WAY PERMIT REQUIRED.
   No person, corporation or firm, other than an authorized employee of the city, shall construct a driveway approach connecting to a public street or right-of-way, or cut, break out or remove any curb along any street or other public way without first obtaining a driveway approach/curb cut permit. Each day of such violation shall constitute a separate offense. Applications for such driveway approach/curb cut permits shall be made at the City Engineer's office, according to the application procedures in this subchapter. The City Engineer or his or her designate may require such construction plans or drawings with the permit application as he deems necessary to:
   (A)   Permit all reviewing authorities to make an intelligent and conclusive review of the application;
   (B)   Enable the contractor to construct the proposed facility in accordance with the terms of the permit;
   (C)   Enable the individual responsible for inspection to ensure that the facility is constructed in accordance with the terms of the permit; and
   (D)   Serve as a record of the construction authorized by the permit.
(Ord. 09-3306, passed 10-15-09)