§ 153.347  NOTIFICATION; INSPECTIONS.
   During the course of the construction of the improvements, the subdivider shall be required to notify the City Engineer at least 24 hours before each of the following operations in order that required inspections can be made:
   (A)   All street subgrades, especially areas where compacted backfilling was placed over subterranean construction, and curb and gutter construction before base material is deposited in place.
   (B)   The base construction before pavement is placed on the base material. It is essential that these inspections be made in order for the city to ascertain the quality of construction preliminary to accepting the improvements for public maintenance. Additional inspections may be required by the City Engineer. The subdivider shall pay a fee for all required inspection. Before Council accepts streets and improvements, all applicable fees shall have been paid to the city.
(Ord. 09-3306, passed 10-15-09)