1161.03 PROCEDURES.
   Upon filing of an application for a building permit, grade plan, or subdivision, the Building Inspector shall use the following procedure to determine if a "storm water management" permit is required for the proposed building, grading or development.
(a)   If more than 25% of the total surface of the parcel or original parcel is proposed to be excavated or graded, or covered with an impervious surface the Building Inspector shall refer the application to the Village Engineer. This information shall be supplied by the applicant at the time of filing the application with the Municipality.
(b)   The Village Engineer shall review the application who shall then notify the Building Inspector whether a storm water management permit is required.
(c)   If a storm water management permit is required the owner/developer shall submit a storm water control plan with grading, hydrological and landscaping plans in compliance with Section 1161.04. No building permit shall be issued before a storm water management permit is issued.
(d)   The Planning and Zoning Commission shall have the authority to request the developer to modify the storm water management plan and preliminary plot plan to better meet the standards and control measures of this chapter to protect the health and welfare of the adjacent property owner and to protect the surrounding topography.
   (Ord. 17-1994. Passed 6-6-94.)