A. The applicant for any development project which includes any residential dwelling units shall be required to pay a water system connection charge thereof at the time an application for utility service is received by the city. This charge shall be based upon meter size and capacity, calculated from a proportionate share of the total additional water system facilities attributable to new residential development. This residential connection charge is calculated on the pro rata basis of the cost of providing new water system facilities, the proportionate share of replacement water system facilities caused by new residential development projects, and the cost of obtaining additional water rights to service new residential development.
B. The specific amount of the water connection charge shall be as follows:
Meter Size Connection Charge
5/8"--3/4" $ 6,200
1" 10,400
1 1/2" 20,600
2" 33,000
3" 66,100
4" 103,400
6" 206,600
8" 330,600
(Ord. 91-06-1100 § 1 (part))