A. All on-site water supply, wastewater collection and sewage lines and facilities shall be provided by the developer in accordance with the City of Signal Hill Standard Plans. Storm drainage facilities shall be provided in accordance with Los Angeles County Flood Control District Standards. Sewage facilities must also be consistent with the Los Angeles County Sanitation District requirements.
B. All new utility lines serving the site, including natural gas, electrical, water, wastewater and communication lines shall be placed underground by the developer.
C. All overhead utility lines on the east side of Orizaba Avenue and the north side of 19th Street will be placed underground. This work will include the elimination of six power poles on Orizaba Avenue and five power poles on 19th Street. Overhead utility lines at the intersection of Gladys Avenue and Ellis Avenue will be modified to the extent possible as determined by the director of public works.
(Ord. 2005-05-1350 § 1; Ord. 2004-06-1332 (part))