16.16.190   Well completion or abandonment.
   Well testing for either production or injection shall be made within thirty days following drilling completion. A copy of production reports supplied to D.O.G. shall be sent to the inspector. A determination of the owner or operator shall be made in writing regarding the immediate future of the well, along with the schedule for construction of all requirements to fulfill the conditional use permit. Abandonment procedures shall proceed in compliance with Chapter 16.24 of this title. In the event the drill site is located in a hillside area, all ground stripped of vegetation shall be seeded with grasses or other ground cover to prevent erosion, as approved by the inspector.
(Ord. 90-08-1074 § 4 (part))