A. Rotary mud, drill cuttings, chemicals, oil or liquid hydrocarbons, and all other oil field wastes derived or resulting from, or connected with the drilling, redrilling or rework of any well shall be discharged into an above ground steel tank, constructed per the American Petroleum Institute (A.P.I.) standards, and removed from the drill site of leasehold within thirty days from completion of drilling, redrilling or rework.
B. Open earth pits for waste disposal are prohibited.
C. Cement slurry or dry cement shall not be disposed of on the surface.
(Ord. 90-08-1074 § 4 (part))