A. All work for which a street surface improvement or excavation permit has been issued shall be performed in accordance with the specifications, plans, and profiles referred to in the permit or, in the absence thereof, in accordance with the general requirements of this chapter. Such work shall be performed under the supervision of an inspector appointed by the city engineer, except when the work consists of patching sidewalk or curb, and the patch will not exceed ten linear feet of curb or twenty-five square feet of sidewalk.
B. When the construction or installation is ready for inspection, the permittee shall request an inspection by the city engineer and the city engineer shall make such inspection within a reasonable time after such request is made by the permittee.
C. The city engineer, in his discretion, may require any work which has been performed without an inspection to be torn out, and he may require the person responsible for the work to furnish laboratory tests or other evidence satisfactory to him that the specifications for the work have been met.
(Prior code § 12.04.240 (Ord. 487 § 23 1960))