A. General: All development sites governed by these regulations shall be subject to inspections by the county. An approved set of plans and permit must be available for review on site whenever work is in progress. It shall be the permittee's responsibility to keep the county notified of the progress of the project.
B. High Risk Soil Types: At a minimum, two (2) inspections shall be required for high risk sites: 1) after erosion and sedimentation controls have been installed, prior to ground disturbance, and 2) after the project has been completed, including revegetation. For sites which are active during the winter, two (2) additional inspections may be required: 1) after the site has been prepared for the winter, and 2) sometime in the spring to ensure that the erosion and sedimentation control measures are adequate and maintained. The permittee's design professional if required shall perform the inspections and submit inspection reports to the county. (Ord. 129, 7-11-2006)