§ 51.01 MAIN LINE, GAS PIPE EXTENSION.
   Whenever the gas utility and water utility within the city have made and completed an extension of their main line or gas pipes in any street or alley within the city, the utilities shall, within 20 days, cause all water and gas service pipes for house connections to be constructed in the street or alley and extended to the inside curb line.
(`81 Code, § 51.01) Penalty, see § 50.999