For a Street to be constructed in existing right-of-way or for an existing street to be improved, the following shall be provided by the developer:
(a) A construction plan submitted on 22" x 34" sheet(s), prepared and stamped by a professional engineer, registered in the State of Ohio, containing, as a minimum, the following information:
(1) Survey of existing right-of-way: to include iron pins set at all angle points on both sides of right-of-way. Survey to be performed and stamped by a professional surveyor, registered in the State of Ohio. Cost for all control surveys and construction layout stakes shall be borne by the developer. Survey shall extend from existing roadway at start of project to end of project. Centerline profile of existing ground shall extend a minimum of 50 feet beyond project limits.
(2) Cross sections of existing and proposed ground: Each section shall extend 35 feet on each side of centerline, at 25-foot intervals on all roads.
(3) Centerline profile of entire street, including proposed and existing ground lines.
(4) Plan of entire street, including existing topographic data. Grading plans may be required, at the discretion of the Village Engineer.
(b) Detailed plan of proposed improved portion of street including 35 foot turning radii at street intersections. Plan and profile view shall extend a minimum of 50 feet beyond the proposed work.
(c) The developer shall be responsible for the costs to relocate and\or replace existing private utilities, storm sewers, sanitary sewer, sidewalks or curb ramps that conflict with the proposed minimum pavement widths.
(Ord. 18-2019. Passed 6-24-19.)