Council hereby adopts the following Zoning Permit (and all other related activities) Fee Schedule:
Single-Family Certificate of Zoning Compliance | $425.00 |
Multi- Family Certificate of Zoning Compliance | $150.00 per dwelling unit |
Alteration/Addition / Garage to approved SF Structure / Site | $325.00 |
Re-Review Fee | $125.00 per hour, minimum fee $125.00 |
Re-Review of Drainage Plan(s) Because of Partial Work or Disapproval | $125.00 per hour, minimum fee $125.00 |
Re-Inspection of Final Work Site | $125.00 |
Outdoor Storage | $ 50.00 |
Zoning/ Building Compliance Commercial | $150.00 + .$0.10 SF $200.00 - 3000 SF $400.00 - 5000 SF $600.00-10000 SF $1,000.00 - > 10000 SF |
Fence | $ 50.00 |
Home Occupation | $ 50.00 |
Certificate of Appropriateness (New Construction) | $500.00 |
Certificate of Appropriateness (Existing Structure) | $300.00 |
Re-Zoning Amendment (non-PUD) | $1,250.00 |
Re-Zoning Amendment (via PUD) | $3,500.00 |
Appeal to Board of Zoning Appeals | $500.00 |
Application for a Variance | $500.00 |
Application for a Conditional Use | $600.00 |
Application for a Lot Split | $200.00 |
Deck | $100.00 |
Gazebo/Porch/Patio | $100.00 |
Driveway Installation / Repair / Repaving | $ 50.00 |
Swimming Pool | $100.00 |
Any Reinspection Required for Any Reason | $ 50.00 |
Any Resubmission Required for Any Reason | $ 50.00 |
Sign | $ 50.00 for the first sign on a parcel plus $ 30.00 for each additional sign on the same parcel |
Council hereby adopts the following Engineering Plan Review Fee Schedule:
Original Plat or Subdivision (without plat) | $750.00 |
Combined Engineering Plans (street, stormwater, sanitary sewer, sediment / erosion, utility, site, signage, signalization, water) | $850.00 |
Sanitary Sewer | $750.00 |
Stormwater Management | $800.00 |
Stormwater Pollution Prevention | $500.00 |
Post-Construction Stormwater BMP Operation and Maintenance Plan | $150.00 |
Traffic | $500.00 |
Lot | $150.00 |
Any Separate, Stand-Alone Engineering Plan | $750.00 |
Revised Plan / Plat | $250.00 |
Engineering Hourly Rate | $150.00 |
(a) All fees listed and identified in the tables above shall be paid in full at the time the application is made. No application and/or request will be accepted or reviewed unless and until the applicable fee(s) is(are) paid.
(b) In addition to the fees listed and identified in the tables above, every applicant also shall pay the Engineer Fees incurred (hourly or any part thereof) by the Village of Shawnee Hills to review and approve the application, certificate, permit, and/or request. The applicable Engineering Fees will be calculated and invoiced separately by the Village and shall be paid in full, within thirty (30) days, by the applicant.
(c) If any work that requires a permit or certificate is commenced prior to the necessary permit or certificate being issued, all work must stop immediately and a permit or certificate must be obtained. All fees for permits and/ or certificates obtained under this subsection shall be double the fee set forth in this Section.
(d) If the Village Administrator and/or Code Enforcement Officer determine work was commenced without a permit and/or certificate because of an emergency situation and if a permit application is completed and the required fee is paid within thirty (30) days after the work was commenced, the standard fees set forth above shall apply. If the Village Administrator and/or Code Enforcement Officer determine work was commenced without a permit and/or certificate because of an emergency situation and if a permit application is not completed and the required fee is not paid within thirty (30) days after the work was commenced, the fee provisions set forth in subsection (c) shall apply.
(e) Fees required herein, or any other part of the Village's Zoning Ordinance, are nonrefundable.
(Ord. 09-2023. Passed 4-24-23.)