(A) Temporary structures placed in areas of special flood hazard. Relief from dry flood-proofing standards may be granted for non-residential structures erected during the dry season (June - October) or for a period of less than 90 days. Temporary structures shall be anchored to prevent flotation, collapse or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during conditions of the base flood. A plan for the evacuating the temporary structure and disconnecting all utilities shall be provided if the structure is allowed to be placed during the wet season (November - May).
(B) Temporary storage in areas of special flood hazard. Temporary storage of goods and materials is allowed during the dry season (June - October) or for a period of less than 90 days. Stored materials shall not include hazardous materials. A plan for removing the stored materials shall be provided if the material is allowed to be placed during the wet season (November - May).
(C) The placement of any temporary structures within the regulatory floodway shall be limited to the dry season (June - October) and require an approved special use permit.
(Ord. 259, passed 3-17-2011; Ord. 286, passed 12-7-2017) Penalty, see § 151.999